Pavia Group IFF Projections

Spin Meeting Update - Nov 2, 2015

Single Spin Asymmetries - Investigation

Paper Preview: IFF @ 500 GeV

Pythia Matching Fractions

 

Constraining PDF’s with STAR data: IU local meeting (October 30, 2015)

 

Geant Cerenkov Summary

A summary of key differences between simulated cerenkov showers and the default energy depoistion simulation.

V2 clarifies some wording in the conclusion

Round Table

Speaker : All


Talk time : 16:20, Duration : 00:20

General topics, such as...

KNN feedback --

Any additional studies useful for ★♪?
Timetable

FTS Tracking with Stv, status

Speaker : Victor


Talk time : 16:00, Duration : 00:20

KFVertex Embedding, etc...

Speaker : Dmitri


Talk time : 15:40, Duration : 00:20

KFParticle Vertex Finder

Adding misalignment of pixel sectors to the geometry

HFT Embedding Discussion

Speaker : Mustafa


Talk time : 15:00, Duration : 00:20

Minutes


Talk time : 10:20, Duration : 00:20

 0) Irakli’s draft to spokesman (overdue)

Minutes


Talk time : 12:00, Duration : 00:20

 
ALIGNMENT for RUN15

- Sanshiro has a full set of values for all systems now including the IST and SSD

S&C Offline Software

2015-10-29 15:00
2015-10-29 16:00
America/New York
Thursday, 29 October 2015
1-165, SRN, at 19:00 (GMT), duration : 01:00
SRN 

ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112
TimeTalkPresenter
15:00HFT Embedding Discussion ( 00:20 ) 0 filesMustafa
15:20Adding misalignment of pixel sectors to the geometry ( 00:20 ) 0 filesJason
15:40KFVertex Embedding, etc... ( 00:20 ) 0 filesDmitri
16:00FTS Tracking with Stv, status ( 00:20 ) 0 filesVictor
16:20Round Table ( 00:20 ) 0 filesAll

2015 Summer IST Maintenance Work II (Cooling System)

Speaker : Jason Bessuille


Talk time : 11:20, Duration : 00:20

 

Run15 IST Offline Software Readiness

Speaker : Bingchu Huang


Talk time : 10:40, Duration : 00:20

 The version in Aug, 2014 from Yaping has been tested. It can be run under pure starsim simulation, run14 AuAu200 production chain, and SL15e embedding test chain.

2015 Summer IST Maintenance Work I (Patch Panel Boards, Chip Status)

Speaker : Bingchu Huang, Zach Miller


Talk time : 11:00, Duration : 00:20

 

Run15 IST Calibration Status II (Gain)

Speaker : Bingchu Huang


Talk time : 10:20, Duration : 00:20

 

Run15 IST Calibration Status I (Pedestal Mean and RMS, Chip Status)

Speaker : Yaping Wang


Talk time : 10:00, Duration : 00:20