Talk at HSQCD2018
Updated on Thu, 2018-08-09 08:32. Originally created by gnigmat on 2018-08-08 10:13.BEMC status tables for the isobar period
Updated on Wed, 2018-08-08 10:07 by elayavalli. Originally created by jeromel on 2018-08-08 10:02.Speaker : Raghav Kunnawalkam Elayavalli ( WSU )
Talk time : 12:50, Duration : 00:10
CEPh BlueStore upgrade
Updated on Wed, 2018-08-08 10:55 by mpoat. Originally created by jeromel on 2018-08-08 10:01.Speaker : Michael Poat ( BNL )
Talk time : 12:35, Duration : 00:15
Database upgrade status and plans
Updated on Wed, 2018-08-08 10:45 by dmitry. Originally created by jeromel on 2018-08-08 09:58.Speaker : Dmitry Arkhipkin ( BNL )
Talk time : 12:15, Duration : 00:20
picoDST status and plans
Updated on Wed, 2018-08-08 11:01 by gnigmat. Originally created by jeromel on 2018-08-08 09:57.Speaker : Grigory Nigmatkulov ( MEPhI )
Talk time : 12:00, Duration : 00:15
Software and Computing Meeting
Updated on Wed, 2018-08-08 09:55 by testadmin. Originally created by jeromel on 2018-08-08 09:55.1-189, SRN, at 16:00 (GMT), duration : 01:00
Time | Talk | Presenter |
---|---|---|
12:00 | picoDST status and plans ( 00:15 ) 0 files | Grigory Nigmatkulov (MEPhI) |
12:15 | Database upgrade status and plans ( 00:20 ) 1 file | Dmitry Arkhipkin (BNL) |
12:35 | CEPh BlueStore upgrade ( 00:15 ) 1 file | Michael Poat (BNL) |
12:50 | BEMC status tables for the isobar period ( 00:10 ) 1 file | Raghav Kunnawalkam Elayavalli (WSU) |
13:00 | AOB ( 00:10 ) 0 files | All (All) |
2018.08.07 JetCorr Meeting Work Update
Updated on Tue, 2018-08-07 10:40. Originally created by djs232 on 2018-08-07 10:40.iTPC software
BNL 1-189, at 15:00 (GMT), duration : 01:00
I reserved bluejeans
Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))
(Global Numbers)
Meeting ID: 481 429 146
Room System
199.48.152.152 or bjn.vc
Meeting ID: 481 429 146
participiant can join w/o moderator.
dE/dx calibration for isobar RunXVIIII
Updated on Mon, 2018-08-06 11:01. Originally created by fisyak on 2018-08-06 11:01. The dE/dx calibration for isobar RunXVIIII has been done.
It is awaiting a check with respect to DEV libraries.
EPD Meeting - 8/6/2018
Updated on Mon, 2018-08-06 09:48. Originally created by skk317 on 2018-08-06 09:48.
Deposited energy of the particles originating from the tunnel entrance
Updated on Mon, 2018-08-13 09:45. Originally created by rolandp on 2018-08-06 09:22.-In my previous posts, we have seen in vertex plots that several particles are forming a sort of rectangle, which we believe to represent the location of the tunnel entrance.
Run 13 (period 1) pp510
Updated on Tue, 2019-05-14 08:27. Originally created by aquinter on 2018-08-06 09:08.The approval of preliminary results on SD and CD
Updated on Mon, 2018-08-06 08:55. Originally created by lukfulek on 2018-08-06 08:37.Twisting Effect from B Field in STAR
Updated on Wed, 2018-09-05 13:13. Originally created by adams92 on 2018-08-06 08:13.Due to the magnetic field in STAR, particles' helices will of course bend.
Request to approve preliminary results on Central Exclusive Production with forward proton measurement in STAR (run 15)
Updated on Mon, 2018-08-06 08:57. Originally created by rafal_s on 2018-08-06 07:55.Reference
Speaker : Rafal Sikora ( AGH University of Science and Technology, Krakow, Poland )
Talk time : 10:30, Duration : 00:30
Request to Approve Preliminary Results on Total and Elastic Cross Sections Measurements in pp collisions at √s = 200 GeV from R
Updated on Mon, 2018-08-06 07:12. Originally created by wlodek on 2018-08-06 07:12.Comparison 2018 TPC Laser Drift Velocities with Old (2013) and New (2018) Alignment based on Cosmics.
Updated on Fri, 2018-08-03 10:18. Originally created by fisyak on 2018-08-03 10:17.Using Cosmic data from days 135 - 162 new TPC sector alignment has been done.
With the new alignment TPC drift velocities have been reproduced for days 66 - 169.
Forward Si Thoughts
Updated on Thu, 2018-08-02 14:14. Originally created by jwebb on 2018-08-02 14:13.FTS Performance Studies
Updated on Thu, 2018-08-02 14:12. Originally created by jwebb on 2018-08-02 14:12.Reference
Speaker : Guannan
Talk time : 16:00, Duration : 00:20
https://drupal.star.bnl.gov/STAR/system/files/20180726_FTS_GXie.pdf
PicoDst Test - 20180802
Updated on Thu, 2018-08-02 13:39. Originally created by dongx on 2018-08-02 13:33.To have a better understanding on the precision and size impact of the choice of different type of variables for NSigmas, I did a test production with several different setups on a single file.