Run 15 BEMC Calibration - September 25 Update
Updated on Wed, 2018-09-26 13:42. Originally created by nlukow on 2018-09-24 13:44.UDATE:
The file shows three plots for each ring comparing E/p with and without TOF cuts.
Probing the Short-Range Nuclear Correlation via dAu UPCs using STAR detector
Updated on Mon, 2018-09-24 09:08. Originally created by starkong on 2018-09-24 09:08.Reference
Speaker : Zhoudunming (Kong) Tu ( BNL )
Talk time : 10:20, Duration : 00:20
low pt e+e- production in UPC events
Updated on Mon, 2018-09-24 08:30. Originally created by jdb on 2018-09-24 08:30.Weekly Meeting (Sep. 24)
- Minghui: scan cone size
- David: Update on Finding MIPs in Data
Analysis - Pass 2 - InvM Matching
Updated on Tue, 2018-09-25 14:53. Originally created by sra233 on 2018-09-24 01:56.Preliminary plots: Central Exclusive Production with forward protons measurement in Roman Pots (pp@200 GeV, run 2015)
Updated on Mon, 2018-09-24 02:35. Originally created by rafal_s on 2018-09-24 01:47. The preliminary plots below have been presented for the first time at the "Diffraction and Low-x 2018" workshop in Reggio Calabria, Italy.
Sept 24th jetcorr Jet Internal Structure analysis update
Updated on Tue, 2018-09-25 11:53. Originally created by elayavalli on 2018-09-23 20:42.Hard Probe 2018: Gamma+jet
Updated on Sat, 2018-12-15 16:58. Originally created by nihar on 2018-09-22 09:48.
Digging for production changes after SL16d
Updated on Fri, 2018-09-21 09:14. Originally created by genevb on 2018-09-20 17:01. Following up on the problematic JetCorr PWG findings...
Calibration status
Updated on Thu, 2018-09-20 15:55. Originally created by ckimstar on 2018-09-20 15:55.Checking if the EPD is hanging safely
Updated on Thu, 2018-09-20 13:29. Originally created by lisa on 2018-09-20 13:28. On 22 June 2018, we took down the EPD and hung it like 20 feet high on the East wall of the IR. We did this with custom-built holders built from hardened steel at OSU. We flex-tested it he
HF-PWG minutes 2018/09/20
Updated on Thu, 2018-09-20 10:27. Originally created by marr on 2018-09-20 10:27.1) Electron PID using a likelihood classifier - Matthew Kelsey
STAR endcap TOF/CBM TOF meeting
Updated on Thu, 2018-09-20 06:48. Originally created by fseck on 2018-09-20 06:48. 2018-10-04 10:00
2018-10-04 12:00
America/New York
Thursday, 4 October 2018
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 14:00 (GMT), duration : 02:00
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 14:00 (GMT), duration : 02:00
STAR endcap TOF/CBM TOF meeting
Updated on Thu, 2018-09-20 06:48. Originally created by fseck on 2018-09-20 06:48. 2018-09-20 10:00
2018-09-20 12:00
America/New York
Thursday, 20 September 2018
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 14:00 (GMT), duration : 02:00
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 14:00 (GMT), duration : 02:00
Electron PID using a Likelihood method
Updated on Thu, 2018-09-20 00:18. Originally created by mkelsey on 2018-09-20 00:18.EPD around Sept 2017
Updated on Wed, 2018-09-19 17:14. Originally created by lisa on 2018-09-19 16:45. In mid-September, 2018, a look back at just....
.... one year ago...
.... one year ago...