Simulation

Speaker : Te-Chuan Huang, Krishan Gopal


Talk time : 10:20, Duration : 00:20

 

STAR Forward Silicon Tracker Meeting

2019-07-18 09:00
2019-07-18 10:30
America/New York
Thursday, 18 July 2019
https://bluejeans.com/101020434 , at 13:00 (GMT), duration : 01:30
TimeTalkPresenter
09:00News ( 00:20 ) 0 filesAll
09:20Hybrid, T-board, Inner Signal Cable ( 00:20 ) 0 filesJianing Dong, Michael Capotosto, Gerard Visser
09:40Mechanical Structure ( 00:20 ) 0 filesYi Yang, Han-sheng Li
10:00Module Assembly and Testing ( 00:20 ) 1 fileAndres Aguilar
10:20Simulation ( 00:20 ) 0 filesTe-Chuan Huang, Krishan Gopal

AOB

Speaker : All ( All )


Talk time : 12:40, Duration : 00:20
  • Could not do it for today but coming soon, screening of opened bugs.

Offline software updates

Speaker : Jason Webb ( BNL )


Talk time : 12:20, Duration : 00:20

Summary of the EIC simulation workshop

Speaker : Dmitri Smirnov ( BNL )


Talk time : 12:00, Duration : 00:20

Summary of this workshop https://indico.bnl.gov/event/6336/


Slides

19W28 S&C Meeting

2019-07-17 12:00
2019-07-17 13:00
America/New York
Wednesday, 17 July 2019
1-189, BlueJean, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Summary of the EIC simulation workshop ( 00:20 ) 0 filesDmitri Smirnov (BNL)
12:20Offline software updates ( 00:20 ) 1 fileJason Webb (BNL)
12:40AOB ( 00:20 ) 0 filesAll (All)

TPC Meeting

2019-07-17 15:00
2019-07-17 16:00
America/New York
Wednesday, 17 July 2019
1-189, at 19:00 (GMT), duration : 01:00

Meeting Location - BNL Room 1-189


The Bluejean connection

Title:  STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR

Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))

Meeting ID: 276 827 050

Direct link: https://bnl.bluejeans.com/276827050

J/psi polarization paper review

Isobar decorr

 

The reply to referee's report for low pt Jpsi

 

TPC summary for run19

 Following the run-19 there are are a number of actions that has to be done ahead of RUN-20

TPC summary for run19

 Following the run-19 there are are a number of actions that has to be done ahead of RUN-20

gpfs003 load, possible Xrootd "giving up"

Clustering studies for the leaky HCal

Speaker : Ting Lin


Talk time : 09:20, Duration : 00:20

 

Software update

Speaker : Daniel Brandenburg


Talk time : 09:00, Duration : 00:20

 

Isobaric-Mix collisions at 200 GeV QA

Rapidity cut in embedding

One of the ways to produce embedding faster is to apply early filtering to remove events that won't pass analysis cuts.

2016 Au+Au @ 200 GeV UPC J/Psi preliminary plots for APS DPF 2019

2015 p+Au @ 200 GeV UPC J/Psi preliminary plots for APS DPF 2019

Iso Mix 2