RUN15 pptrans calibration final QA (1)

- Conditions applied for conventional integrated mass distributions I've been shown:

 a. For each event:
     a-1. Skip abort gap

CME_stuff

 

AOB


Talk time : 16:40, Duration : 00:20

Round table


Talk time : 16:20, Duration : 00:20

StvRK


Talk time : 16:00, Duration : 00:20

S&C Offline Software

2019-09-12 16:00
2019-09-12 17:00
America/New York
Thursday, 12 September 2019
1-189, at 20:00 (GMT), duration : 01:00
TimeTalkPresenter
16:00StvRK ( 00:20 ) 0 files
16:20Round table ( 00:20 ) 0 files
16:40AOB ( 00:20 ) 0 files

results from run 19

Speaker : Akio, David, ...


Talk time : 14:35, Duration : 00:40

 

trigger algorithms and firmware

Speaker : Akio et al.


Talk time : 14:05, Duration : 00:30

 

rack layout

Speaker : Tim / Gerard / Tonko


Talk time : 14:00, Duration : 00:05

 

DEP

Speaker : Tonko


Talk time : 13:30, Duration : 00:30

 

lunch break

Speaker : -


Talk time : 12:00, Duration : 01:30

 

discussion / slow control for sTGC high voltage

Speaker : Lukas Holub


Talk time : 11:30, Duration : 00:30

 

FCS slow controls

Speaker : Paul Nord


Talk time : 11:10, Duration : 00:20

 

discussion & break

Speaker : -


Talk time : 10:40, Duration : 00:30

 

fPRE status/plans

Speaker : David


Talk time : 10:20, Duration : 00:20

 

Cables and patchpanels on detector

Speaker : Tim (& Oleg, Gerard)


Talk time : 10:10, Duration : 00:10

 

ECAL & HCAL FEE boards

Speaker : Gerard


Talk time : 09:50, Duration : 00:20

 

ECAL & HCAL SiPM boards

Speaker : Oleg


Talk time : 09:40, Duration : 00:10

 

LED system

Speaker : Tim


Talk time : 09:20, Duration : 00:20

 

ECAL & HCAL Detector status/plans/schedule

Speaker : Oleg


Talk time : 09:00, Duration : 00:20