STAR PWGC meeting
Updated on Fri, 2020-08-14 09:46. Originally created by marr on 2020-07-31 16:07.https://bnl.zoomgov.com/j/1619294511?pwd=TkRhZzFjOWZSQnpvUVdGUGFVMmlHdz09, at 13:30 (GMT), duration : 00:00
1) PicoDst production of 2010 AuAu200_production, AuAu200_production_2011, UU_production_2012
- AuAu200_production_2011, P11id_SL19c, PicoDst produced: the data member "Event.mNBTOFMatch" is always 0, which originates from MuDst. This appears to be a feature of the original production, where PPV was the vertex-finder. PPV has its own BTOF-matching code, which was not set to run during production.
- Check with your PWG about the proposed chain option for 2010 AuAu200_production, UU_production_2012: picoDst PicoVtxMode:PicoVtxDefault PicoCovMtxMode:PicoCovMtxWrite PicoBEmcSmdMode:PicoBEmcSmdWrite
2) The latest embedding status can be found in Xianglei's report: SLIDES. In general, the embedding jobs are moving forward smoothly.
- Irakli will follow up on 3He embedding issue (ticket #2561)
3) Proposal from embedding team: stop to store event.root files for future embedding productions to save disk space. Please check with PWG whether MuDst files are sufficient.
- The BEMC MC information is currently missing in the MuDst. We will identify people to implement this.
4) TPC experts continue to work on resolving the issue of m2 splitting observed in 19.6 GeV collision data. No timeline yet.
5) Latest version of preliminary request template: TEMPLATE
- I will release to collaboration on Monday if no further comments received.
v2 and delta gamma in Run18FXT3GeV
Updated on Fri, 2020-07-31 11:04. Originally created by fengyich on 2020-07-31 11:04.
R correlator cross check 3 small system
Updated on Fri, 2020-07-31 11:03. Originally created by fengyich on 2020-07-31 11:03.
CME FG meeting 07.31
Updated on Fri, 2020-07-31 08:30. Originally created by haojiexu on 2020-07-31 08:30.
detailed check of ADC
Updated on Fri, 2020-07-31 01:04. Originally created by mhstar on 2020-07-31 01:04.Here is a detailed check of ADC distribution. After excluding FMS_LED trigger events, we still see a bump for many channels, especially for accumulated ADC.
LFS_UPC QA
Updated on Thu, 2020-07-30 22:29. Originally created by bkimel on 2020-07-30 22:29.Reference
Speaker : Ben Kimelman
Talk time : 12:00, Duration : 00:20
Weekly Meeting (July 31th, 2020)
- Minghui: summary of current calibration issues
- Xiaoxuan: dipi0 update
- Latif: Number of FMS photons: Generated vs reconstructed
itpc Sector 13 corrupt data Run #21212023
Updated on Thu, 2020-07-30 16:51. Originally created by jml on 2020-07-30 15:28.The point: That the extra tracks charge is seen in ZB data because regular data from other events are mixed in: Zb is on the left!
Summary: schedule
Updated on Fri, 2020-07-31 13:17. Originally created by videbaks on 2020-07-30 13:52.FST overview
Updated on Fri, 2020-07-31 14:23 by yezhenyu. Originally created by videbaks on 2020-07-30 13:19.Integration
Updated on Thu, 2020-07-30 13:10. Originally created by videbaks on 2020-07-30 13:10.mechanical structure and assembly
Updated on Thu, 2020-07-30 13:09. Originally created by videbaks on 2020-07-30 13:09.Hybrid and Tboard
Updated on Thu, 2020-07-30 13:08. Originally created by videbaks on 2020-07-30 13:08.FST module and assembly
Updated on Thu, 2020-07-30 08:41. Originally created by videbaks on 2020-07-30 08:41.FST Readiness Review
Updated on Thu, 2020-07-30 08:42 by videbaks. Originally created by eca on 2020-07-29 20:17.Online on BJ, at 12:30 (GMT), duration : 00:00
We hold a Readiness Review for the FST
BJ Info: https://bluejeans.com/107664522?src=join_info
Meeting ID: 107 664 522
The review page is on indigo: -https://indico.bnl.gov/event/9021/ with PW fst2021
The review committee:
Jim Stewart Chair |
BNL |
|
Grzegorz Deptuch |
BNL |
gdeptuch@bnl.gov |
Jim Mills |
BNL |
mills@bnl.gov |
Gerrit van Nieuwenhuizen |
BNL |
nieuwhzn@gmail.com |
Paul O’Connor |
BNL |
poc@bnl.gov |
Time | Talk | Presenter |
---|---|---|
07:30 | FST module and assembly ( 00:20 ) 1 file | Sun Xu |
07:50 | Hybrid and Tboard ( 00:20 ) 1 file | Maowu Nie |
08:10 | mechanical structure and assembly ( 00:20 ) 1 file | Yi Yang |
08:30 | Integration ( 00:20 ) 1 file | Rahul Sharma |
08:50 | FST overview ( 00:20 ) 1 file | Zhenyu Ye |
09:10 | Summary: schedule ( 00:20 ) 2 files | F.Videbæk |
Status of Forward Silicon Tracker Simulation
Updated on Wed, 2020-07-29 15:03. Originally created by krishan on 2020-07-29 15:03.
TPC Meeting
Updated on Wed, 2020-07-29 14:41. Originally created by iraklic on 2020-07-29 08:47.BlueJeans, at 19:00 (GMT), duration : 01:00
The Bluejean connection
Title: STAR TPC Weekly
Description: Weekly TPC meeting for the STAR Collaboration
Community: STAR
Phone Dial-in
+1.408.740.7256 (US (San Jose))
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (US (Primary, San Jose))
Meeting ID: 628 045 566
Direct link: https://bnl.bluejeans.com/628045566
Systematic Uncertainties for Pion A_LL
Updated on Thu, 2020-11-12 12:39. Originally created by wsolyst on 2020-07-29 08:20.
20200729 FST MS Changes
Updated on Fri, 2020-07-31 08:13. Originally created by yiyang on 2020-07-29 07:24.
Polarization7.2GeV
Updated on Wed, 2020-07-29 02:36. Originally created by kokubo on 2020-07-29 02:36.