T-board and Inner Signal Cable
Updated on Fri, 2020-11-20 14:44. Originally created by yezhenyu on 2020-11-20 14:44.Speaker : Maowu Nie, Michael Capotosto ( SDU, BNL )
Talk time : 09:10, Duration : 00:10
Production module assembly
Updated on Fri, 2020-11-20 14:44. Originally created by yezhenyu on 2020-11-20 14:44.Speaker : Zhenyu Ye ( UIC )
Talk time : 09:30, Duration : 00:10
Mechanical Structure
Updated on Mon, 2020-11-23 09:41 by yiyang. Originally created by yezhenyu on 2020-11-20 14:44.Speaker : Yi Yang ( NCKU )
Talk time : 09:20, Duration : 00:10
T-board and Inner Signal Cable
Updated on Fri, 2020-11-20 14:44. Originally created by yezhenyu on 2020-11-20 14:44.Speaker : Maowu Nie, Michael Capotosto ( SDU, BNL )
Talk time : 09:10, Duration : 00:10
Integration
Updated on Fri, 2020-11-20 14:44. Originally created by yezhenyu on 2020-11-20 14:44.Speaker : Rahul Sharma, Felix Archampong ( BNL )
Talk time : 09:00, Duration : 00:20
Follow-up on action items
Updated on Fri, 2020-11-20 14:56. Originally created by yezhenyu on 2020-11-20 14:44.Speaker : all
Talk time : 08:30, Duration : 00:30
************* From Nov 16 *************
Production status:
Hybrids (80): done
Integration test
Updated on Sun, 2020-11-22 21:34 by sunxuhit. Originally created by yezhenyu on 2020-11-20 14:44.Speaker : Xu Sun, Prithwish Tribedy, Hu Yu
Talk time : 09:40, Duration : 00:20
STAR Forward Silicon Tracker Meeting
Updated on Fri, 2020-11-20 14:43. Originally created by yezhenyu on 2020-11-20 14:43. 2020-11-23 08:30
America/New York
Monday, 23 November 2020
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 13:30 (GMT), duration : 00:00
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 13:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
08:30 | Follow-up on action items ( 00:30 ) 0 files | all |
09:00 | Integration ( 00:20 ) 0 files | Rahul Sharma, Felix Archampong (BNL) |
09:10 | T-board and Inner Signal Cable ( 00:10 ) 0 files | Maowu Nie, Michael Capotosto (SDU, BNL) |
09:20 | Mechanical Structure ( 00:10 ) 1 file | Yi Yang (NCKU) |
09:30 | Production module assembly ( 00:10 ) 0 files | Zhenyu Ye (UIC) |
09:40 | Integration test ( 00:20 ) 1 file | Xu Sun, Prithwish Tribedy, Hu Yu |
Weekly Meeting (Nov 20th, 2020)
- Minghui: look J/psi simulation
- Latif: Updated Polarization
Run14 AuAu@200 QA
Updated on Fri, 2020-11-20 08:04. Originally created by kshen on 2020-11-20 08:04.
Raw yield comparison
Updated on Fri, 2020-11-20 06:43. Originally created by zli1 on 2020-11-20 06:43.
Does the pT distribtuion difference betweenLambda and anti-Lambda affect the global polarization measurements?
Updated on Thu, 2020-11-19 20:43. Originally created by fengyich on 2020-11-19 20:43.
ANN paper zip file
Updated on Thu, 2020-11-19 07:36. Originally created by wlodek on 2020-11-19 07:36.
Run12 pp500 Final Endcap Dijet Asymmetries
Updated on Wed, 2020-12-02 15:29. Originally created by jhkwas on 2020-11-18 18:55.FCS CABLE MAPPING
Updated on Wed, 2020-11-18 14:13. Originally created by timcam on 2020-11-18 14:13.
This is a formatted version from Akio's auto-generated CSV file.
FCS CABLE MAPPING
Updated on Wed, 2020-11-18 14:12. Originally created by timcam on 2020-11-18 14:12.
This is a formatted version from Akio's auto-generated CSV file.
Update on event-by-event charge separation in Au+Au collisions at sNN 200 GeV with the STAR detector
Updated on Wed, 2020-11-18 09:14. Originally created by jagbir on 2020-11-18 09:14.
FCS Mechanical Drawings
Updated on Tue, 2020-11-17 16:49. Originally created by timcam on 2020-11-17 16:16.
This page contains the scale drawings for the ECAL and HCAL Detectors, for the purpose of cable routing from the FEE cards to Signal/Patch Boards.
STAR forward sTGC meeting
Updated on Wed, 2020-11-25 12:44. Originally created by sprastar on 2020-11-17 16:14. 2020-11-18 08:30
America/New York
Wednesday, 18 November 2020
remort, at 13:30 (GMT), duration : 00:00
remort, at 13:30 (GMT), duration : 00:00
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
The bluejeans information is below: https://bluejeans.com/967581615
Phone Dial-in
+1.408.740.7256 (United States)
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (Alternate number) (Global Numbers)
Meeting ID: 967 581 615
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;
The bluejeans information is below: https://bluejeans.com/967581615
Phone Dial-in
+1.408.740.7256 (United States)
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (Alternate number) (Global Numbers)
Meeting ID: 967 581 615