T-board and Inner Signal Cable

Speaker : Maowu Nie, Michael Capotosto ( SDU, BNL )


Talk time : 09:10, Duration : 00:10

Production module assembly

Speaker : Zhenyu Ye ( UIC )


Talk time : 09:30, Duration : 00:10

Mechanical Structure

Speaker : Yi Yang ( NCKU )


Talk time : 09:20, Duration : 00:10

T-board and Inner Signal Cable

Speaker : Maowu Nie, Michael Capotosto ( SDU, BNL )


Talk time : 09:10, Duration : 00:10

Integration

Speaker : Rahul Sharma, Felix Archampong ( BNL )


Talk time : 09:00, Duration : 00:20

Follow-up on action items

Speaker : all


Talk time : 08:30, Duration : 00:30

************* From Nov 16 ************* 
Production status:
Hybrids (80): done

Integration test

Speaker : Xu Sun, Prithwish Tribedy, Hu Yu


Talk time : 09:40, Duration : 00:20

STAR Forward Silicon Tracker Meeting

2020-11-23 08:30
America/New York
Monday, 23 November 2020
Zoom meeting ID: 87904302955 Passcode: fSTAR2021, at 13:30 (GMT), duration : 00:00
TimeTalkPresenter
08:30Follow-up on action items ( 00:30 ) 0 filesall
09:00Integration ( 00:20 ) 0 filesRahul Sharma, Felix Archampong (BNL)
09:10T-board and Inner Signal Cable ( 00:10 ) 0 filesMaowu Nie, Michael Capotosto (SDU, BNL)
09:20Mechanical Structure ( 00:10 ) 1 fileYi Yang (NCKU)
09:30Production module assembly ( 00:10 ) 0 filesZhenyu Ye (UIC)
09:40Integration test ( 00:20 ) 1 fileXu Sun, Prithwish Tribedy, Hu Yu

Weekly Meeting (Nov 20th, 2020)

  - Minghui: look J/psi simulation
  - Latif: Updated Polarization

Run14 AuAu@200 QA

 

Raw yield comparison

 

Does the pT distribtuion difference betweenLambda and anti-Lambda affect the global polarization measurements?

 

ANN paper zip file

 

Run12 pp500 Final Endcap Dijet Asymmetries

FCS CABLE MAPPING

 
This is a formatted version from Akio's auto-generated CSV file.

FCS CABLE MAPPING

 
This is a formatted version from Akio's auto-generated CSV file.

Update on event-by-event charge separation in Au+Au collisions at sNN 200 GeV with the STAR detector

 

FCS Mechanical Drawings

 
This page contains the scale drawings for the ECAL and HCAL Detectors, for the purpose of cable routing from the FEE cards to Signal/Patch Boards.

STAR forward sTGC meeting

2020-11-18 08:30
America/New York
Wednesday, 18 November 2020
remort, at 13:30 (GMT), duration : 00:00
Agenda:
1. Production status;
2. Electronics status;
3. Integration status;
4. Simulation status;

The bluejeans information is below: https://bluejeans.com/967581615
Phone Dial-in
+1.408.740.7256 (United States)
+1.888.240.2560 (US Toll Free)
+1.408.317.9253 (Alternate number) (Global Numbers)
Meeting ID: 967 581 615

AOB


Talk time : 12:40, Duration : 00:10