3 gev paper draft

 

20210225_CF_PWGMeeting

 

Minor problem in sector alignment distortion correction

Speaker : G. Van Buren ( BNL )


Talk time : 15:10, Duration : 00:20

Please see this blog post.

-Gene

Short_Term_Stability

Speaker : Navagyan Ghimire


Talk time : 12:40, Duration : 00:20

 

Minor problem in sector alignment distortion correction

In 2011, I introduced and documented a distortion correction for the displacement of the gating grid from its intended position due to the misalignment of TPC (sub)sectors (see You do not have access to view this node).

2021 STAR Analysis Meeting Start-Less TOF

 

Run 14 BEMC tower selection with new calibration

All run numbers
Int_t RunPre[452] = { 15076101, 15076102, 15076105, 15076108, 15076109, 15077001, 15077002, 15077003, 15077004, 15077006,

Trying new waveform fitting

Speaker : David Kapukchyan


Talk time : 12:20, Duration : 00:20

Short_term_stability_Temp_amplitude

 

Short_term_stability_LED_amplitude

 

jet-h correlations

Speaker : Joel Mazer ( Rutgers )


Talk time : 11:20, Duration : 00:30

Run XXI Ks0 mass and STAR main magnet current

Speaker : Yuri Fisyak


Talk time : 15:05, Duration : 00:05

 https://drupal.star.bnl.gov/STAR/system/files/Ks0vsCurrent.pdf

Run XX dE/dx calibration

Speaker : Yuri Fisyak


Talk time : 15:00, Duration : 00:05

 https://drupal.star.bnl.gov/STAR/system/files/RunXXdEdx.pdf

Compare of Net-Kaon Results using Track by Track and Average Efficiency Method

Small Zero Suppression Tweaks

Speaker : Tonko Ljubicic ( BNL )


Talk time : 12:00, Duration : 00:20

 

210224_3GeV_Xiv1

East Sector 1

I noticed that Sector 1 on the East side has had some strange behavior (way too many details are at: drupal.star.bnl.gov

vn-pt correlation in isobar

 

vn-pt correlation in isobar

 

AOB


Talk time : 12:40, Duration : 00:10

 - isobar data restoration / pp510 production status
 - Xrootd writing tool
 - RT
 - Collaboration meeting