testtest
Updated on Fri, 2021-12-10 13:14. Originally created by ekuzina on 2021-12-10 13:14.test entry with attachement
Run-by-run QA for centrality determination in Au$+$Au Collisions at BES-II 19.6 GeV
Updated on Fri, 2021-12-10 11:52. Originally created by ashik on 2021-12-10 11:52.BES2 14.6GeV rapidity dependence of n sigma
Updated on Wed, 2021-12-08 23:51. Originally created by yghuang on 2021-12-08 23:51.
FTT Commissioning Plan
Updated on Wed, 2021-12-08 09:24. Originally created by chiyang on 2021-12-08 09:24.Talk time : 09:10, Duration : 00:20
Weekly Meeting (Dec 07th, 2021)
- Xilin: Roman Pot simulation
- Xiaoxuan: dipi0 update
- William: FPS/FPOST update
- Minghui: J/Psi check
proton_lambda correlation function update
Updated on Tue, 2021-12-07 20:41. Originally created by qyq on 2021-12-07 09:12.
FST Commissioning Plan
Updated on Tue, 2021-12-07 08:46. Originally created by sunxuhit on 2021-12-07 08:46.FCS run22 commissioning plan
Updated on Tue, 2021-12-07 08:44. Originally created by akio on 2021-12-07 08:44.Speaker : akio
Talk time : 08:30, Duration : 00:20
https://www.star.bnl.gov/protected/spin/akio/fcs/construction/index.html#run22
Analysis_meeting_aboutQM2022_photo_produced_dilepton
Updated on Tue, 2021-12-07 04:02. Originally created by zj1994 on 2021-12-07 04:02.
TPC SC&GL Calibration: Run21 AuAu 7.7 GeV
Updated on Sun, 2021-12-26 11:27. Originally created by pokhrel on 2021-12-06 10:58.Dataset:
--> Run 21, Collision = Au-Au, √s = 7.7 GeV, Trigger Setup = production_7p7GeV_2021
--> Run Period: Week of Jan, 25 -- Apr, 26
Study of identified hadrons in Au+Au collisions at √sNN = 27 and 54.4 GeV using the STAR detector at RHIC
Updated on Mon, 2021-12-06 05:14. Originally created by krishan on 2021-12-06 05:14.
My-FCV-blog
Updated on Wed, 2025-03-19 05:06. Originally created by subhash on 2021-12-05 21:13.
General:
STAR Preliminary request template
Run-by-run QA for centrality determination in Au$+$Au Collisions at BES-II 19.6 GeV
Updated on Fri, 2021-12-03 13:10. Originally created by ashik on 2021-12-03 13:10.D mesons in p+p at 500 GeV
Updated on Wed, 2023-02-15 08:23. Originally created by vanekjan on 2021-12-03 09:12.
Installation and Commissioning
Updated on Sat, 2021-12-11 10:40. Originally created by yezhenyu on 2021-12-02 16:14.Speaker : Xu Sun, Yu Hu ( UIC, Fudan )
Talk time : 08:00, Duration : 00:10
Geometry and Misalignment
Updated on Sat, 2021-12-11 10:40. Originally created by yezhenyu on 2021-12-02 16:14.Speaker : Gavin Wilks, Flemming Videbaek, Daniel Brandenburg ( UIC, BNL )
Talk time : 08:30, Duration : 00:10
Online and Offline Software
Updated on Sat, 2021-12-11 10:40. Originally created by yezhenyu on 2021-12-02 16:14.Speaker : Xu Sun, Shenghui Zhang ( UIC )
Talk time : 08:20, Duration : 00:10
DAQ
Updated on Sat, 2021-12-11 10:40. Originally created by yezhenyu on 2021-12-02 16:14.Speaker : Tonko Ljubicic ( BNL )
Talk time : 08:10, Duration : 00:10
Installation and Commissioning
Updated on Thu, 2021-12-02 16:16. Originally created by yezhenyu on 2021-12-02 16:14.Speaker : Xu Sun, Yu Hu ( UIC, Fudan )
Talk time : 08:30, Duration : 00:10