Radiation estimates for TOF rings

Here I give rough estimates for the radiation we can expect for the inner ring on the currently considered forward TOF rings. Rates are taken from run 7.

2007 BEMC Calibration check with stgamma production electrons

To perform a check on the BEMC calibration for run 7, I began by looking over the electrons from the StGamma production. 

Action items from last week

Speaker : All


Talk time : 00:45, Duration : 00:10

Follow up on any of last weeks action items
Abridged from minutes:

Embedding requests and priority

Speaker : Lee


Talk time : 00:40, Duration : 00:05

We have the following requests active or in the pipeline:

QM Poster Abstracts - Last Chance

Speaker : Lee, Dhevan


Talk time : 00:35, Duration : 00:05

QM extended the deadline to November 8th so there could be a last chance for anyone considering a poster abstract.

20 GeV New production QA

Speaker : Helen (not available) ( Yale )


Talk time : 00:25, Duration : 00:10

Helen can't make it but we can still discuss the plots she posted

Ridge in 62 GeV Au

Speaker : Christine ( Yale )


Talk time : 00:10, Duration : 00:15

See:

First Look 62 GeV Cu V0

Speaker : Pan Pan ( Yale )


Talk time : 00:00, Duration : 00:10

See:
http://rhig.physics.yale.edu/~fan/V0SpectraUpdateOct25.html

Generic Software Coordinator

General Position Description: detector sub-system software coordinator

Analysis Coordinator

STAR Physics Analysis Coordinator

Responsibilities:

1) To work with the physics working group convenors and as appropriate the Software and Computing Project Leader, Simulations L

Calibration Coordinator

Position and responsibilities Description: Calibration coordinator

Simulation Leader

Responsibilities Description: Simulation Leader

Reconstruction Leader

Responsibilities Description: Reconstruction Leader

Run 8 preparation meetings #5

2007-11-02 15:00
2007-11-02 16:00
Etc/GMT-5
Friday, 2 November 2007
1-189, HighSpeed conference bridge, at 19:00 (GMT), duration : 01:00

Optimizing IST layout

Speaker : Gerrit J. van Nieuwenhuizen II ( MIT )


Talk time : 13:20, Duration : 00:10

Status of optimizing efforts so far.

Update on crosscheck test sample

Speaker : Jan Kapitan


Talk time : 13:10, Duration : 00:15

Update on pileup test sample

Speaker : Jan Kapitan


Talk time : 13:00, Duration : 00:10

Update on Ylms in Pion Kaon

Speaker : Adam Kisiel ( OSU )


Talk time : 10:50, Duration : 00:20

www.star.bnl.gov/protected/hbt/kisiel/071101/PionKaonYlms3.php

Paper Proposal : Pion HBT in AuAu@22GeV + systematic study

Speaker : Mike & Zbigniew ( OSU )


Talk time : 10:30, Duration : 00:20

see attachment

STAR Management Document

Under:

This tree contains STAR Management related documents.