Run 8 preparation meetings #8
Updated on Fri, 2007-12-07 13:26. Originally created by testadmin on 2007-11-30 14:57.1-189, HighSpeed Conference Bridge, at 20:00 (GMT), duration : 02:00
Going over the action items from our last meeting.
Database issues.
FastOffline chain progress and readiness.
Pion-Kaon data vs. Therminator
Updated on Fri, 2007-11-30 08:49. Originally created by kisiel on 2007-11-30 08:49.Reference
Speaker : Adam Kisiel ( OSU )
Talk time : 00:00, Duration : 00:20
www.star.bnl.gov/protected/hbt/kisiel/071129/PionKaonTherminator.php
Trigger Emulator Test
Updated on Thu, 2007-11-29 19:44. Originally created by jwebb on 2007-11-29 19:42.code --
Albedo from the support structure
Updated on Fri, 2007-11-30 13:35 by weixie. Originally created by margetis on 2007-11-29 17:50.Speaker : Quan Wang
Talk time : 14:00, Duration : 00:10
http://www.physics.purdue.edu/~wang187/protected/hft/quan.11.30.ppt
Tests with new geometry, single IST layer
Updated on Fri, 2007-11-30 12:05. Originally created by margetis on 2007-11-29 16:14.Speaker : Willie,Jan, Spiros
Talk time : 13:40, Duration : 00:20
D0 background estimation
Updated on Thu, 2007-11-29 19:53 by kapitan. Originally created by margetis on 2007-11-29 16:13.Proposed agenda/softw talks at LBL vetting review Dec 17/18
Updated on Thu, 2007-11-29 16:12. Originally created by margetis on 2007-11-29 16:12.HFT hardware meeting
Updated on Thu, 2007-11-29 13:08. Originally created by videbaks on 2007-11-29 12:24.phone meeting +1-510-486-7333, at 18:00 (GMT), duration : 01:00
2) Mechanical supports of the detector - Howard W.
3) Trigger and dead time responses - Leo
4) IST - Gerrit (??)
5) Additional Items
Getting information on old simulation requests
System for submitting and viewing simulation request was taken down after web server incident. This is still useful information though.
Trigger Simu Test
Updated on Wed, 2007-11-28 14:27. Originally created by ahoffman on 2007-11-28 14:27.I am trying to figure out why the trigger simulator only returns as 'good' a fraction of the events returned as 'good' by the online L2-gamma trigger. Let me state that a different way...
Anything Else
Updated on Tue, 2007-11-27 18:53. Originally created by matis on 2007-11-27 18:53.Reference
Talk time : 01:00, Duration : 00:20
Software : hit residual
Updated on Wed, 2007-11-28 09:09 by bouchet. Originally created by matis on 2007-11-27 18:52.L2 Status
Updated on Tue, 2007-11-27 18:52. Originally created by matis on 2007-11-27 18:52.Shipping of Detectors
Updated on Tue, 2007-11-27 18:51. Originally created by matis on 2007-11-27 18:51.Current status of review committees
Updated on Tue, 2007-11-27 18:50. Originally created by matis on 2007-11-27 18:50.ZDC
Updated on Mon, 2008-03-03 12:28. Originally created by xzb on 2007-11-27 16:34. Under:Hardware and software related to ZDC
Updated Charged Pion A_{LL} predictions


No really dramatic changes here. The increased asymmetries might mean that g-g scattering is even more important than predicted originally. Of course, this goes in the wrong direction if we're looking for better agreement with our Pythia.
online QA test
I'm attaching two pdfs showing the online QA plots from run 8330100 for the EEMC trig HT input, DSM layer-0 and BEMC trig BEMC DSM LO input - High Tower. Let me know if they look reasonable??
2008 BEMC Preliminary Timing Curves from L2 Data
Jan Balewski suggested that I try to determine the BEMC timing curves
from L2 data. Here is my first attempt from the data Oleg Tsai took a few days
ago: