General infrastructure

Speaker : Wayne Betts ( BNL )


Talk time : 16:55, Duration : 00:20

- Disk Mounting for Trigger
- Progress (result) on Slow Control firewall rules
- NIC card (Dan)

QA overview

Speaker : Gene Van Buren ( BNL )


Talk time : 16:35, Duration : 00:20

- Shift Report in the db ; working well? Any problems?
- Documentation, reference histos etc ....
- Progress on the PPlots

EVPLibv and TPX integration to offline

Speaker : Valeri Fine ( BNL )


Talk time : 16:20, Duration : 00:15

ESL and SQL connector progress

Speaker : Levente Hajdu ( BNL )


Talk time : 16:10, Duration : 00:10

Change control scheme

Speaker : Jerome Lauret ( BNL )


Talk time : 16:00, Duration : 00:10

Run 8 support meeting #12

2008-01-04 16:00
2008-01-04 17:00
Etc/GMT-5
Friday, 4 January 2008
2-187, at 21:00 (GMT), duration : 01:00
.
TimeTalkPresenter
16:00Change control scheme ( 00:10 ) 0 filesJerome Lauret (BNL)
16:10ESL and SQL connector progress ( 00:10 ) 0 filesLevente Hajdu (BNL)
16:20EVPLibv and TPX integration to offline ( 00:15 ) 0 filesValeri Fine (BNL)
16:35QA overview ( 00:20 ) 0 filesGene Van Buren (BNL)
16:55General infrastructure ( 00:20 ) 0 filesWayne Betts (BNL)

pi-Xi: momentum resolution, correlation of backround

Speaker : Petr Chaloupka


Talk time : 00:30, Duration : 00:30

http://www.star.bnl.gov/protected/hbt/petrchal/Jan2008/main.html

Archive

Under:

Current Release Assignments

STAR SOFTWARE NEWS December 3, 2007
---------------------
The present release assignment:

2007

Under:
 ---------------------  
SL02e (SL02e) ROOT_LEVEL 3.02.07 pp and AuAu 200GeV real data production

Anything Else


Talk time : 01:10, Duration : 00:20

IST Status

Speaker : Gerrit


Talk time : 00:50, Duration : 00:20

HFT Status

Speaker : Howard W.


Talk time : 00:30, Duration : 00:20

No progress on a date for CDO

Speaker : Hans Georg


Talk time : 00:10, Duration : 00:20

Happy New Year


Talk time : 00:00, Duration : 00:10

Account re-activation

Under:

The instructions here are for users who have an account at the RCF but have unfortunately let their BNL appointment expire or do not know how to access their (old) account.

Post installation

Under:

Soft-links for compatibility

In /opt/star (or equivalent), $STAR and $ROOT/$ROOT_LEVEL, run t

STAR codes

Under:

Basic


The STAR code and libraries follows a structure and policy described in Library release structure and policy. Changes in each version is described in Library release history.

CERN libraries

Under:

The STAR simulation framework will require the CERN libraries to be installed.

No AFS user

A summary of our Photon XS Measurement Efforts

The starting points for our work attempting to measure the photon cross section were a set of papers (OPAL: hep-ex/0305075, ZEUS: