Filtering PYTHIA Events In Starsim
Updated on Mon, 2008-01-28 21:15. Originally created by betan on 2008-01-16 11:48. Under:Within the STAR framework, simulation files are created with the command starsim which runs both PYTHIA and GEANT. Unfortunately, this means that there is no straightforward way to filt
a Overview (Jan, later Ross)
Updated on Wed, 2008-08-20 09:08. Originally created by balewski on 2008-01-14 10:43. Under:Graph illustrates the key changes in L2 processing scheme allowing for fast event abortion. Jan
L2 documentation
Updated on Wed, 2009-02-25 16:31. Originally created by balewski on 2008-01-14 10:42. Under:.
Kalman 102 : 1D tracking
Updated on Wed, 2008-05-07 10:58. Originally created by balewski on 2008-01-14 10:38.I have developed some interest in Kalman tracking.
Found this writeup
Centrality re-definition in Cu+Cu 200 GeV data
Updated on Tue, 2008-01-15 05:04. Originally created by lbarnby on 2008-01-14 09:05.Reference
Speaker : Anthony Timmins ( Birmingham )
Talk time : 00:50, Duration : 00:10
Powerpoint summary to follow attached.
Detailed page is:
QM Talk - "Multi-strange particles production in Cu+Cu collisions at 200 GeV in the ..." - review of 1st draft
Updated on Tue, 2008-01-15 06:18. Originally created by lbarnby on 2008-01-14 09:01.Reference
Speaker : Xiaobin Wang ( Tsinghua )
Talk time : 00:25, Duration : 00:25
Presentation or link to follow.
QM Talk "System size dependence of di-hadron correlations with identified strange particles..." - review of 1st draft
Reference
Speaker : Christine Nattrass ( Yale )
Talk time : 00:00, Duration : 00:25
Attached ppt file is now the one from the link Christine sent around before the meeting. I had previously attached preview which she had earlier sent to Jun and I.
FGT-HN Upload contributions
balewski | |||
---|---|---|---|
1 | Miro_PCBoard.pdf | PDF 54.29 KB | May 15 2009 18:07:57. |
2 | Miro-apv_brd_pcb.pdf | PDF 176.16 KB | May 15 2009 18:15:13. |
3 | 2008-10-FGT-DNPv1.pdf | PDF 5.25 MB | May 15 2009 18:14:40. |
gvisser | |||
---|---|---|---|
1 | Slides from Miro, for FGT phone meeting, friday 2/8/2008 | PDF 349.33 KB | May 15 2009 18:08:17. |
2 | FGT & SSD electrical services materials budget - PRELIMINARY | VND.MS-EXCEL 21 KB | May 15 2009 18:04:45. |
3 | First quote for aluminum-based cable for ALL FGT SERVICES - MAX 7.24mm OD - technical details may be changed still | PDF 36.83 KB | May 15 2009 18:07:39. |
4 | [from Doug] Draka # HTC-50-1-1, 5kVdc cable (CERN spec) | PDF 79.46 KB | May 15 2009 18:11:46. |
miro | |||
---|---|---|---|
1 | M_brd Quote Proto.pdf | PDF 32.24 KB | May 15 2009 18:08:05. |
2 | apv_board_doc.pdf | PDF 67.31 KB | May 15 2009 18:22:36. |
3 | apv_board_pcb.pdf | PDF 112.81 KB | May 15 2009 18:17:32. |
4 | sig_board_doc.pdf | PDF 49.27 KB | May 15 2009 18:22:38. |
5 | sig_board_pcb.pdf | PDF 53.45 KB | May 15 2009 18:06:49. |
6 | mechtest_pcb.pdf | PDF 38.23 KB | May 15 2009 18:07:01. |
7 | mechtest_doc.pdf | PDF 86.36 KB | May 15 2009 18:03:40. |
8 | mechtest_quote.pdf | PDF 62.77 KB | May 15 2009 18:03:29. |
9 | mechtrim_pcb.pdf | PDF 107.18 KB | May 15 2009 18:11:34. |
10 | pwr_board_pcb.pdf | PDF 34.17 KB | May 15 2009 18:06:57. |
pagebs | |||
---|---|---|---|
1 | VertexPosition_mit0001_33_4000evts.jpg | JPEG 43.64 KB | May 15 2009 18:06:30. |
2 | OPcountsQCD.png | PNG 13.65 KB | May 15 2009 18:15:29. |
3 | OPcountsW.png | PNG 17.83 KB | May 15 2009 18:04:16. |
4 | ETspectrumQCD.png | PNG 16.2 KB | May 15 2009 18:08:59. |
5 | ETspectrumW.png | PNG 17.87 KB | May 15 2009 18:15:36. |
6 | IsoET01.png | PNG 13.64 KB | May 15 2009 18:12:55. |
7 | IsoET07.png | PNG 13.88 KB | May 15 2009 18:14:05. |
8 | TrigEToverIsoET01.png | PNG 16.89 KB | May 15 2009 18:05:31. |
9 | TrigEToverIsoET07.png | PNG 17.61 KB | May 15 2009 18:10:40. |
10 | TrigOverIso01.png | PNG 16.4 KB | May 15 2009 18:07:03. |
11 | TrigOverIso026.png | PNG 15.03 KB | May 15 2009 18:21:17. |
12 | TrigOverIso07.png | PNG 16.88 KB | May 15 2009 18:21:22. |
13 | geantAccessSample.txt | PLAIN 916 bytes | May 15 2009 18:07:02. |
14 | setC3detectedSpectra.png | PNG 12.8 KB | May 15 2009 18:04:35. |
15 | setC3thrownSpectra.png | PNG 13.45 KB | May 15 2009 18:21:19. |
16 | Abstract10-08V1.0.pdf | PDF 18.53 KB | May 15 2009 18:04:45. |
17 | v4.0_FinalSpectra.png | PNG 13.65 KB | May 15 2009 18:17:35. |
18 | Abstract10-08V1.3.pdf | PDF 19.61 KB | May 15 2009 18:04:19. |
rfatemi | |||
---|---|---|---|
1 | Bogary_Mush.jpg | JPEG 481.46 KB | May 15 2009 18:15:35. |
wwjacobs | |||
---|---|---|---|
1 | eemc_trigger_patches_annotated.pdf | PDF 988.89 KB | May 15 2009 18:04:16. |
2 | BPMT_BPRS 003.jpg | JPEG 1.04 MB | May 15 2009 18:06:51. |
3 | eemc_swingarm.pdf | PDF 61.82 KB | May 15 2009 18:03:46. |
wzhang | |||
---|---|---|---|
1 | Sunset.jpg | JPEG 69.52 KB | May 15 2009 18:04:49. |
2 | disk123.gif | GIF 19.86 KB | June 08 2009 14:04:09. |
3 | backFgtHit.gif | GIF 30.89 KB | June 08 2009 14:06:15. |
Children pages below contain FGT-HN uploads from individual users.
New users: please follow this instruction.
Warning: never remove uploaded attachments - it would mess up automatic # on the summary page for any subsequent uploads. Instead upload revised attachment.
Kaon-pion correlations in d+Au: constructing a reference with non-identified hadrons
Updated on Fri, 2008-01-11 10:56. Originally created by kopytin on 2008-01-11 10:56.Reference
Speaker : Mikhail Kopytine
Talk time : 00:00, Duration : 00:20
Grid Meeting
Updated on Fri, 2008-01-11 09:25. Originally created by testadmin on 2008-01-11 09:25.1-189, HighSpeed conference bridge, at 18:00 (GMT), duration : 01:00
Grid Meeting
Updated on Fri, 2008-01-11 09:25. Originally created by testadmin on 2008-01-11 09:25.1-189, HighSpeed conference bridge, at 18:00 (GMT), duration : 01:00
Grid Meeting
Updated on Fri, 2008-01-11 09:25. Originally created by testadmin on 2008-01-11 09:25.1-189, HighSpeed conference bridge, at 18:00 (GMT), duration : 01:00
Grid Meeting
Updated on Fri, 2008-01-11 09:25. Originally created by testadmin on 2008-01-11 09:25.1-189, HighSpeed conference bridge, at 18:00 (GMT), duration : 01:00
Grid Meeting
Updated on Fri, 2008-01-11 09:25. Originally created by testadmin on 2008-01-11 09:25.1-189, HighSpeed conference bridge, at 18:00 (GMT), duration : 01:00
Grid Meeting
Updated on Fri, 2008-01-11 09:25. Originally created by testadmin on 2008-01-11 09:25.1-189, HighSpeed conference bridge, at 18:00 (GMT), duration : 01:00
Grid Meeting
Updated on Fri, 2008-01-11 09:25. Originally created by testadmin on 2008-01-11 09:25.1-189, HighSpeed conference bridge, at 18:00 (GMT), duration : 01:00
Grid Meeting
Updated on Fri, 2008-01-11 09:25. Originally created by testadmin on 2008-01-11 09:25.1-189, HighSpeed conference bridge, at 18:00 (GMT), duration : 01:00
- « first
- ‹ previous
- 1
- 2
- 3