Total (sector) energy minus gamma candidate (5-strip cluster) energy in EEMC SMD[u-v] layer.
Updated on Thu, 2008-06-26 16:21. Originally created by seluzhen on 2008-06-26 16:21.Total minus gamma candidate (3x3 cluster) energy in EEMC tower
Updated on Thu, 2008-06-26 16:18. Originally created by seluzhen on 2008-06-26 16:18.Total minus gamma candidate (3x3 cluster) energy in EEMC pre-shower 2 layer
Updated on Thu, 2008-06-26 16:15. Originally created by seluzhen on 2008-06-26 16:15.Total minus gamma candidate (3x3 cluster) energy in EEMC pre-shower 1 layer
Updated on Thu, 2008-06-26 15:59. Originally created by seluzhen on 2008-06-26 15:59.IOperf
Updated on Tue, 2008-07-01 13:26 by testadmin. Originally created by wbetts on 2008-06-26 14:22. Under:Now trying tests with IOperf
( http://nucwww.chem.sunysb.edu/htbin/software_list.cgi?package=ioperf )
Total minus gamma candidate (3x3 cluster) energy in EEMC post-shower layer
Updated on Thu, 2008-06-26 13:28. Originally created by seluzhen on 2008-06-26 13:28.missing TPC FEE in UPGR15
Updated on Wed, 2008-06-25 22:02. Originally created by balewski on 2008-06-25 22:02.The following command:
nex;dcut CAVE x 0.0 2.0 2.0 0.05 0.05
as used to produce TPC Y-Z cross section.
Looks to me THE TPC electronic card are missing in UPGR13.
Orpheus Mall Research Log
Updated on Wed, 2008-06-25 20:47. Originally created by omall on 2008-06-25 20:47.CuCu Spectra Pi- Spectra
Gamma candidate EEMC pre-shower 1 energy (3x3 cluster)
Updated on Wed, 2008-06-25 16:24. Originally created by seluzhen on 2008-06-25 16:24.Simple tests -- hdparm and dd
Updated on Fri, 2008-08-29 16:30. Originally created by wbetts on 2008-06-25 16:15. Under:Starting with the basics, hdparm:
Five samples of the following:
On eastwood:
Mapping for SMD and PRS
Updated on Thu, 2008-08-07 10:17. Originally created by mattheww on 2008-06-25 14:05.Attached are extensive mapping files for the BSMD and BPRS. These maps were generated for 2008-03-04 10:30:54, which is the beginning of run 9064017.
Disk IO testing, comparative study 2008
Updated on Fri, 2009-05-15 09:26 by testadmin. Originally created by wbetts on 2008-06-25 13:04. Under:Two test nodes, named eastwood and newman, are configured for testing in summer 2008.
problem with BTOW geometry in Geant
Updated on Sun, 2008-11-02 14:58. Originally created by balewski on 2008-06-25 11:26.This is zoom in on the eta=1 gap between BTOW & ETOW.
details of tracking efficiency for run5
Updated on Wed, 2008-06-25 09:08. Originally created by bouchet on 2008-06-25 09:08.Reference
Speaker : Jonathan Bouchet
Talk time : 00:50, Duration : 00:10
http://drupal.star.bnl.gov/STAR/2008/24
AOB
Updated on Tue, 2008-06-24 19:00. Originally created by matis on 2008-06-24 19:00.Reference
Talk time : 00:40, Duration : 00:10
Mailing List Change
Updated on Tue, 2008-06-24 18:59. Originally created by matis on 2008-06-24 18:59.Proposal Report
Updated on Tue, 2008-06-24 18:58. Originally created by matis on 2008-06-24 18:58.Reference
Talk time : 00:10, Duration : 00:20
Meeting at Nantes this week
Updated on Tue, 2008-06-24 18:55. Originally created by matis on 2008-06-24 18:55.Reference
Speaker : Christophe/Stephane
Talk time : 00:00, Duration : 00:10