gamma-hadron correlations in p+p, d+Au (poster)

Speaker : Federica Benedosso


Talk time : 16:00, Duration : 00:30

Coffee Break

gamma-hadron correlations in p+p

Speaker : Subhasis Chattopadhyay


Talk time : 15:15, Duration : 00:30

gamma/pi spectra in p+p

Speaker : Martijn Russcher


Talk time : 14:45, Duration : 00:30

electron-hadron correlations in p+p

high-pt/heavy flavour Joitn session

TimeTalkPresenter
14:00electron-hadron correlations in p+p ( 00:45 ) 0 filesXiaoyan Lin

Grid meeting

Under:
-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
Quick agenda
- Grid operation meeting summary     - Wayne
- Site status - All
BNL
SPU
WSU
BHAM
UIC

- SUMS new configuration, status/progress report - Leve

- If we have time
* BHAM and SRM, could Eric help setting the same framework?
* VDT and AFS, status
* STAR plan progress - statement and interest from remote site

meeting info: 6PM UK, 1 PM EST/EDT, 12 PM CDT, 10 AM PDT or in room 1-189 and/or
+ Phone: 8383 (+1-631-344-8383).
+ VRVS Subway room (Community=Transport/Universe)


STAR environment on OS X

Under:

This page is obsolete -- please see Mac port of STAR offline software for the current status

In order of decreasing importance:

Database Mirror

Under:

Xgrid

Under:
Summary of Apple's Xgrid cluster software and the steps we've taken to get it up and running at MIT.

MIT

Under:

STAR Inner Silicon tracking detector committee report

AOB

Speaker : All ( All )


Talk time : 14:20, Duration : 00:10

Run VII purchase follow-up and discussion

Speaker : Jerome Lauret ( BNL )


Talk time : 14:00, Duration : 00:10

tripwire evaluation and configuration

Speaker : Mike DePhillips ( BNL )


Talk time : 14:10, Duration : 00:10

Run VII preparation, meeting #6

Under:
-00-00
Thursday, 1 January 1970
, at 00:00 (GMT), duration : 00:00
TimeTalkPresenter
14:00Run VII purchase follow-up and discussion ( 00:10 ) 0 filesJerome Lauret (BNL)
14:10tripwire evaluation and configuration ( 00:10 ) 0 filesMike DePhillips (BNL)
14:20AOB ( 00:10 ) 0 filesAll (All)

MIP check on 2006 Slope Calibration

Under:

Run 3 BTOW Calibration

Under:

I plan on "Drupalizing" these pages soon, but for now here are links to Marco's slope calibration and Alex's MIP and Electron calibrations for the 2003 run:

Marco's tower slope calibration

DC IOPerf 20061029 (time after) - jpg

Under:
DC IOPerf 20061029 (time after) - jpg

DC IOPerf 20061027 (time before) - jpg

Under:
DC IOPerf 20061027 (time before) - jpg