Library release history

Under:

Documents and information for current STAR Software releases

inclusive photon v2 from PMD

Speaker : Rashmi Raniwala


Talk time : 16:30, Duration : 00:20

2005 BSMD zero-suppressed ADCs

Background:  Ahmed posted some studies of the BSMD in Run 7 indicating that the ADC dynamic range is limited.  Pibero and Willie showed a dramatic band structure of the raw ADCs in the 2006 pp, and people wondered how far back this structure existed.  Here is the data from 2005.

What's being plotted:

  • 2005 pp data
  • BSMDE
  • zero-suppressed at (adc-ped) < 1.5*rms
  • NOT pedestal-subtracted
  • restricted to status==1
  • ~4000 files from throughout Run 5
  • strip softId on x-axis -- each plot is another 1000 strips

And finally, here's a projection of strips 1-150:

Clearly, the band structure was there as well.

Update:  Renee mentioned that 4500-4600 look a little cleaner than the rest.  Here are projections for 4500-4590 and 4500-4650.  The band structure doesn't disappear, but the slope of the exponential fall-off is steeper so fewer counts end up in the screwy 500+ regime.  Here are the results of fits to the region 100 - 150:

0001-0150:  slope = -0.0105
4500-4650:  slope = -0.0130
4500-4590:  slope = -0.0150

See also:  2005 BSMD zero-suppressed ADCs (minbias triggers)

HBT PWG Contribution to QM08 (v1)

See attached version 1 of the Analysis Meeting talk

LUNCH (then Orange Room)

Update on \Lambda_c

Speaker : Jan Kapitan


Talk time : 14:05, Duration : 00:15

Discussion of task/priorities/manpower

Speaker : All


Talk time : 16:50, Duration : 00:30

Break / STI Pulls analysis (TBC)

Speaker : TBD (for Willie)


Talk time : 16:30, Duration : 00:20

HFT Optimization

Speaker : J. Thomas/(Gerrit)


Talk time : 15:40, Duration : 00:45

Prototype patch simulations

Speaker : Spiros/(Howard)


Talk time : 15:20, Duration : 00:20

DCA resolutions from STI/BFC

A new presentation is attached at the bottom.

Speaker : Spiros


Talk time : 15:00, Duration : 00:20

PileUp work and CD0 production plans/needs

The pileup_09_14.ppt is with the old algorithm which suffer's statsitcal effect and cause non-flat Z coordinate dependence.

Speaker : Wei Xie


Talk time : 14:30, Duration : 00:30

Ghosting and D0 efficiency

Speaker : Jan Kapitan


Talk time : 13:50, Duration : 00:15

Software Overview

Speaker : Spiros


Talk time : 13:30, Duration : 00:20

MSH v2

Speaker : Shusu Shi


Talk time : 10:30, Duration : 00:30

Discussion

Priorities, revisit our year schedules, next meeting etc

Speaker : (can be late afternoon)


Talk time : 10:50, Duration : 00:20

SSD status and plans

Speaker : J. Thomas


Talk time : 10:30, Duration : 00:20

IST (detector, R&D plans)

Speaker : Gerrit


Talk time : 10:10, Duration : 00:20

Pixel (detector, development plan)

Speaker : Howard


Talk time : 09:50, Duration : 00:20

Proposal Status

Speaker : Flemming, Hans Georg


Talk time : 09:30, Duration : 00:20