FMS
Updated on Wed, 2008-02-13 14:18. Originally created by dunlop on 2008-02-13 14:18.Speaker : C. Gagliardi
Talk time : 12:00, Duration : 00:20
FGT
Updated on Wed, 2008-02-13 14:18. Originally created by dunlop on 2008-02-13 14:18.Speaker : B. Surrow
Talk time : 11:30, Duration : 00:30
HFT
Updated on Wed, 2008-02-13 16:31 by videbaks. Originally created by dunlop on 2008-02-13 14:17.Speaker : F. Videbaek
Talk time : 11:00, Duration : 00:30
Overview
Updated on Wed, 2008-02-13 15:39 by xzb. Originally created by dunlop on 2008-02-13 14:17.Speaker : Z. Xu
Talk time : 10:30, Duration : 00:30
Upgrades
Updated on Wed, 2008-02-13 14:16. Originally created by dunlop on 2008-02-13 14:16.Time | Talk | Presenter |
---|---|---|
10:30 | Overview ( 00:30 ) 1 file | Z. Xu |
11:00 | HFT ( 00:30 ) 1 file | F. Videbaek |
11:30 | FGT ( 00:30 ) 0 files | B. Surrow |
12:00 | FMS ( 00:20 ) 0 files | C. Gagliardi |
12:20 | DAQ1000 ( 00:20 ) 1 file | Z. Xu, T. Ljubicic, J. Landgraf |
12:40 | TOF ( 00:20 ) 0 files | G. Eppley |
14:00 | Software and Computing Project Overview ( 00:45 ) 1 file | Jerome Lauret |
Collaboration Meeting Mumbai
Updated on Wed, 2008-02-13 13:40. Originally created by dunlop on 2008-02-13 13:40.Collaboration Meeting
Run7 Prepass Evaluation
Updated on Wed, 2008-02-13 14:39. Originally created by genevb on 2008-02-13 12:01. Under:With all calibrations now done, I wanted to see whether running with the Prepass was still any better than running using the 1-second RICH scalers which are, as of the Run 7 data, fully available thro
Preshower Plots
Updated on Tue, 2008-02-12 11:08. Originally created by wleight on 2008-02-12 11:07.The pdfs below have plots of the BPRS energy, eta, and phi distributions for 5000 events (piminus and gamma), determined by looping through all preshower hits and selecting those with eta > -.2.&nb
List of L2 bugs/issues we've found:
Updated on Thu, 2008-02-14 04:58. Originally created by rcorliss on 2008-02-12 06:44.The following is a list of bugs in the L2 code, and their solutions, if we've found them. Apologies for the sketchy page, it's very late at night for me.
STAR Scheduler Configuration
Updated on Sun, 2008-02-10 21:31. Originally created by kocolosk on 2008-02-10 19:38.I deployed a private build of SUMS (roughly 1.8.10) on CMSAF and made the following changes to globalConfig.xml to get local job submission working:
In the Queue List
In the Policy List
Now for the Dispatcher
And finally, here's the site configuration block
offline framework description
Updated on Wed, 2008-10-01 07:46. Originally created by balewski on 2008-02-09 23:02. Under:How to compile & run full suit of L2-algos offline.
di-jets from pp 2008 collisions
Updated on Fri, 2008-02-08 17:56. Originally created by balewski on 2008-02-08 17:54.
More details from L2-jet algo in PDF
Run 8 support meeting #13
Updated on Fri, 2008-02-08 13:30. Originally created by testadmin on 2008-02-08 13:30.1-189, HighSpeed conference bridge, at 21:00 (GMT), duration : 01:00
Initial Setup
Updated on Sun, 2008-02-10 20:22. Originally created by kocolosk on 2008-02-06 16:45.First things first. I went to http://www2.lns.mit.edu/compserv/cms-acctappl.html and applied for a local account. The welcome message contained a link to the CMSAF User Guide found on this TWiki page.
AFS isn’t available on CMSAF, so I started a local tree at /osg/app/star/afs_rhic and began to copy over stuff. Here’s a list of what I copied so far (nodes are running SL 4.4):
CERNLIB
/afs/rhic.bnl.gov/asis/sl4/slc4_ia32_gcc345/cern
OPTSTAR
/afs/rhic.bnl.gov/i386_sl4/opt/star/sl44_gcc346
GROUP_DIR
/afs/rhic.bnl.gov/star/group
ROOT 5.12.00
/afs/rhic.bnl.gov/star/ROOT/5.12.00/root
/afs/rhic.bnl.gov/star/ROOT/5.12.00/.sl44_gcc346
SL07e (sl44_gcc346 only)
/afs/rhic.bnl.gov/star/packages/SL07e
I copied these precompiled libraries over instead of building them myself because of a tricky problem with the interactive nodes’ configuration. The main gateway node is a 64-bit machine, so regular attempts at compilation produce 64-bit libraries that we can’t use. CMSAF has a node reserved for 32-bit builds, but it’s running SL 3.0.5. We’re still working on a proper resolution of that problem. Perhaps we can force cons to do 32-bit compilations.
The environment scripts are working, although I had to add more hacks than I thought were necessary. I only changed the following files:
- ~/.login
- ~/.cshrc
- $GROUP_DIR/site_post_setup.csh
It doesn’t seem possible to change the default login shell (chsh and ypchsh both fail), so when you login you need to type “tcsh” to get a working STAR environment (after copying my .login and .cshrc to your home directory, of course).
Basic interactive tests look good, and I’ve got a SUMS configuration that will do local job submissions to the Condor system (that’s a topic for another post). DB calls use the MIT database mirror. I think that’s all for now.
CMS Analysis Facility
Updated on Sun, 2008-02-10 19:54. Originally created by kocolosk on 2008-02-06 16:09.MIT’s CMS Analysis Facility is a large Tier-2 computing center built for CMS user analyses. We’re looking into the viability of using it for STAR computing.
News from the front
Updated on Wed, 2008-02-06 10:44. Originally created by testadmin on 2008-02-06 10:44.Speaker : Steven Trentalange ( UCLA )
Talk time : 12:00, Duration : 00:10
AOB
Updated on Wed, 2008-02-06 12:53. Originally created by testadmin on 2008-02-06 10:40.Speaker : All ( All )
Talk time : 12:40, Duration : 00:10
- Status of the single hit option implementation for SVT/SSD simulation & evaluation
- Deployment of a new ESL (Electronic Shift Log)
TPX calibration preview, understanding shaper
Updated on Wed, 2008-02-06 10:58 by fisyak. Originally created by testadmin on 2008-02-06 10:39.Speaker : Yuri Fisyak ( BNL )
Talk time : 12:25, Duration : 00:15
Several runs were taken to understand the shaper. This is important to understand how to simulated TPX response (and has impact on embedding and raw slow simulator).
TPX and TOF integration to offline status
Updated on Wed, 2008-02-06 13:03 by fine. Originally created by testadmin on 2008-02-06 10:37.Speaker : Valeri Fine ( BNL )
Talk time : 12:10, Duration : 00:15
The "daq i/o layer" prototype to integrate the offline production framework with the last version of the DAQ i/o system provided by the online group (Tonko/Jeff: R
f) L2-jet (B+E) ver2006=Jan, ver2008=Will
Updated on Wed, 2008-08-20 09:09. Originally created by balewski on 2008-02-05 16:46. Under:Params: