Year7 data reconstruction issues overview (MC, RealData and drop of globals with SVT on)
Updated on Wed, 2008-04-30 10:47. Originally created by testadmin on 2008-04-30 10:16.Speaker : Yuri Fisyak ( BNL )
Talk time : 12:20, Duration : 00:20
Calibration overview for Year8
Updated on Wed, 2008-04-30 11:00 by genevb. Originally created by testadmin on 2008-04-30 10:15.Speaker : Gene Van Buren ( BNL )
Talk time : 12:00, Duration : 00:20
Calibration Status for Run VIII
April 30, 2008Slow Controls
Updated on Tue, 2008-04-29 17:11 by testadmin. Originally created by gorbunov on 2008-04-29 17:09. Under:STAR Slow Control description and operations
STAR Software News
Updated on Wed, 2008-04-30 09:46 by bouchet. Originally created by matis on 2008-04-29 16:49.Reference
Speaker : Jonathan
Talk time : 00:40, Duration : 00:20
embedding maker status
Cabling and Integration Meeting May 16
Updated on Tue, 2008-04-29 16:47. Originally created by matis on 2008-04-29 16:47.Repair Status
Updated on Tue, 2008-04-29 16:46. Originally created by matis on 2008-04-29 16:46.Reference
Speaker : Christophe/Stephan
Talk time : 00:00, Duration : 00:20
SlowControl
Updated on Tue, 2008-04-29 08:53. Originally created by jcs on 2008-04-29 08:53. Under:FTPC Slow Control
study 2 , err(AL) , eta=[1,2], LT=800/pb (Jan)
Updated on Tue, 2008-05-13 11:45. Originally created by balewski on 2008-04-29 08:10. Under:A_L on this has a WRONG sign, I did not know RHICBOS is using different sign convention, JAN
Section A) Theore
SVT Meeting
Updated on Thu, 2009-05-28 17:03. Originally created by bouchet on 2008-04-28 22:26.04/29/2008 : embedding maker
05/05/2008
Quality of hits : it has to be calculated as the ratio between GEANT HIT energy and RECO HIT energy (see below)
Update on iterative drift velocity exclusion
Updated on Mon, 2008-04-28 18:50. Originally created by witt on 2008-04-28 18:50.InterlockSystem
Updated on Mon, 2008-04-28 16:28. Originally created by jcs on 2008-04-28 16:26. Under:DAQ
Updated on Mon, 2008-04-28 16:11. Originally created by jcs on 2008-04-28 16:11. Under:FTPC DAQ
The FTPC data aquisition system is tied in with the main STAR DAQ.
study 1 of S/B, A_L, LT=800/pb (Jan)
Updated on Tue, 2008-05-13 11:45. Originally created by balewski on 2008-04-28 15:32. Under:A_L on this has a WRONG sign, I did not know RHICBOS is using different sign convention
Se
Hardware
Updated on Mon, 2008-04-28 15:26. Originally created by jcs on 2008-04-28 15:20. Under:
FTPC Hardware
Documentation
Updated on Mon, 2008-04-28 17:27. Originally created by jcs on 2008-04-28 15:10. Under:FTPC Documentation
Update on distortion corrections
Updated on Mon, 2008-04-28 14:36. Originally created by genevb on 2008-04-28 14:25.Reference
Speaker : G. Van Buren
Talk time : 00:00, Duration : 00:05
It turns out that all this consideration of charge buildup on the endcap, and possible attenuation of the charge coming out of the GridLeak (neutralization of the ions) was unnecessary.
Extraction of SMD shower-shape information using conversion method
Updated on Thu, 2008-05-01 11:18. Originally created by jwebb on 2008-04-28 11:33.Calibrations
Updated on Sat, 2012-10-27 00:56. Originally created by jcs on 2008-04-28 08:19. Under:FTPC Calibration Home Page
STAR femtoscopy slides for 2008 Users Meeting
Updated on Sun, 2008-04-27 16:25. Originally created by lisa on 2008-04-27 16:25.Hello,
Here (see the attached powerpoint file) are some slides/plots suggested for inclusion in the 2008 RHIC/AGS Users' Meeting talk which Tom Trainor will give.
Determining efficiencies, yields for signal and background, take 1
Updated on Fri, 2008-05-02 14:47. Originally created by jwebb on 2008-04-27 15:59.Contents: