Pixel Mechanical
Updated on Wed, 2008-08-13 16:29. Originally created by matis on 2008-08-13 16:29.Speaker : Howard W.
Talk time : 00:10, Duration : 00:10
News
Updated on Wed, 2008-08-13 16:23. Originally created by matis on 2008-08-13 16:23.Speaker : Hans Georg/Flemming
Talk time : 00:00, Duration : 00:10
Locations of Akio's pages in protected/spin
Updated on Wed, 2008-09-03 06:53 by testadmin. Originally created by akio on 2008-08-13 11:27. Under:August 13, 3 runs produced with PPV w/o using CTB
20080813_energy_highStripShiftU
Updated on Wed, 2008-08-13 11:11. Originally created by seluzhen on 2008-08-13 11:11.AOB
Updated on Wed, 2008-08-13 10:55 by testadmin. Originally created by jeromel on 2008-08-13 09:58.Speaker : All ( All )
Talk time : 12:55, Duration : 00:05
- Condor versus LSF
- We are at the end of the 2 weeks check of condor scalability. After a few adjustements, the queue seems to stand well and balance.
IO performance testing
Updated on Fri, 2008-08-15 15:42 by wbetts. Originally created by jeromel on 2008-08-13 09:31.Speaker : Wayne Betts ( BNL )
Talk time : 12:40, Duration : 00:15
Year 7/8 production updates
Updated on Fri, 2008-10-31 02:28 by testadmin. Originally created by jeromel on 2008-08-13 09:29.Speaker : Lidia Didenko ( BNL )
Talk time : 12:20, Duration : 00:10
The content of this page has been moved to Production Status Update for run 2007/2008 under production.
Vertex finder studies updates
Updated on Wed, 2008-08-13 15:01 by balewski. Originally created by jeromel on 2008-08-13 09:27.Speaker : Akio Ogawa ( BNL )
Talk time : 12:00, Duration : 00:20
See Run8 pp 3rd test production for more information on this topic.
Schema evolution project, status report
Updated on Wed, 2008-08-13 10:56 by testadmin. Originally created by jeromel on 2008-08-13 09:25.Speaker : Philippe Canal ( Canal+ )
Talk time : 12:30, Duration : 00:20
Software and Computing phone meeting
Updated on Wed, 2008-08-13 09:24 by testadmin. Originally created by jeromel on 2008-08-13 09:24.1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
12:00 | Vertex finder studies updates ( 00:20 ) 0 files | Akio Ogawa (BNL) |
12:20 | Year 7/8 production updates ( 00:10 ) 0 files | Lidia Didenko (BNL) |
12:30 | Schema evolution project, status report ( 00:20 ) 1 file | Philippe Canal (Canal+) |
12:40 | IO performance testing ( 00:15 ) 1 file | Wayne Betts (BNL) |
12:55 | AOB ( 00:05 ) 0 files | All (All) |
ssd geometry in simulation
Updated on Wed, 2008-08-13 07:30. Originally created by bouchet on 2008-08-13 07:29.Reference
Speaker : jonathan Bouchet
Talk time : 00:50, Duration : 00:10
AOB
Updated on Tue, 2008-08-12 19:59. Originally created by matis on 2008-08-12 19:59.Reference
Talk time : 00:30, Duration : 00:20
Writing Assignments for HFT CDR
Updated on Tue, 2008-08-12 19:58. Originally created by matis on 2008-08-12 19:58.News?
Updated on Tue, 2008-08-12 19:57. Originally created by matis on 2008-08-12 19:57.Reference
Talk time : 00:00, Duration : 00:10
dAu200 (2008)
Updated on Tue, 2009-01-20 10:58. Originally created by genevb on 2008-08-12 18:20. Under:Some studies were done initially to get a good guess at the SpaceCharge in dAu.
Detailed event comparison PPV & VPD vertex, (Rosi)
Updated on Wed, 2008-09-03 06:53 by testadmin. Originally created by balewski on 2008-08-12 15:57. Under:BFC
Jan's notes
Updated on Wed, 2008-09-03 06:53 by testadmin. Originally created by balewski on 2008-08-12 15:46. Under:-------- Loose notes, needs cleanup, Jan
Spin asymmetry statistical errors
Updated on Wed, 2008-08-20 18:24. Originally created by kurnadi on 2008-08-11 22:06.This study on statistical errors was prompted by the horrible linear fit to the fill-by-fill inclusive electron asymmetry, as shown at the June 2008 Collaboration Meeting at UC Davis.
Cuts: Primary Vertex Z, Track Eta
Updated on Mon, 2008-08-11 21:08. Originally created by kurnadi on 2008-08-11 21:06.Two of the cuts that significantly reduced the number of electrons available for this analysis is the event primary vertex-z and track-η cuts.
drawings for the FGT full-size prototype frames, HV layer, and GEM foils, August 11, 2008
Updated on Mon, 2008-08-11 12:16. Originally created by balewski on 2008-08-11 12:16. Under:These are the current drawings for the FGT full-size prototype frames, HV layer, and GEM foils.