Upsilon Trigger Efficiency Calculation for pp2006 triggers-> L2 Trigger 2

From:

Spin Physics PWG meeting

2008-09-11 12:00
Etc/GMT-4
Thursday, 11 September 2008
Phone-bridge: 317 263 8800 1 077795# 1, at 16:00 (GMT), duration : 00:00

Agenda on meeting page

20080910_sidedResidualQAplots

20080910_sidedResidualQAplots

Upsilon Trigger Efficiency Calculation for pp2006 triggers-> L0 Trigger

Ignoring the problems with the acceptance efficiency, I can still calculate trigger efficiencies.  The L0 trigger requirement is: a 3 tower cluster > 4 GeV.  In my code, I use the L2 s

STAR Management Meeting

2008-09-17 10:00
2008-09-17 11:00
Etc/GMT-7
Wednesday, 17 September 2008
BNL, 50-I-189, at 14:00 (GMT), duration : 01:00

Conference Phone Number: 510 486 7333

   Time:  10 - 11 am EDT

 * --===================================--*

  Agenda:

    1) Upgrade Issues - Helen/Zhangbu

    2) Activities at WAH - Bill

* --===================================--*

    Brief Summary:

    

 * --===================================--*

   News and Other Meetings:

   1) STAR Reginal Meeting and QGP Meeting, Nov. 24-28, 2008, VECC, Kolkata, India

      Contact: Subhasis Chattopadhyay,    sub@veccal.ernet.in

  2) List of student's thesis topics in STAR

  3) QM09 STAR highlight tals (2), parallel talks, individual invited talks

v2 measurement in U+U

RP detection at low energies using the BBC

Heavy flavor flow and exotic flow

Flow vs. Momentum Conservation Effects (15+10)

Data Jet Distributions in Eta and Pt with Vertex Cut ( |vz| < 60 cm) for Fill 7847

Quadrupole analysis: technique and results (20+5)

Flow measurements and hints of incomplete thermalization (20+15)

Effects of eccentricity fluctuations and nonflow on elliptic flow methods (15+15)

The status of flow measurements (15+15)

Planning for efficient data transfer

Speaker : Michal Zerola ( NPI/ASCR )


Talk time : 12:40, Duration : 00:20

DAQ event filtering

Speaker : Valeri Fine ( BNL )


Talk time : 12:20, Duration : 00:20

The goal: Produce smaller ".daq file" containing only events of giving events ID.

Post Crossing track cuts and flag

Speaker : Akio Ogawa ( BNL )


Talk time : 12:00, Duration : 00:20

See Akio's page Post Crossing Track Cuts

 

Software and Computing phone meeting

2008-09-10 12:00
Etc/GMT-5
Wednesday, 10 September 2008
1-189, HighSpeed conference bridge, at 16:00 (GMT), duration : 00:00
TimeTalkPresenter
12:00Post Crossing track cuts and flag ( 00:20 ) 0 filesAkio Ogawa (BNL)
12:20DAQ event filtering ( 00:20 ) 0 filesValeri Fine (BNL)
12:40Planning for efficient data transfer ( 00:20 ) 1 fileMichal Zerola (NPI/ASCR)

Upsilon Trigger Efficiency Calculation for pp2006 triggers-> Acceptance 2

Geometric acceptance was originally found to be much higher, ~0.5