HFT Software

2012-02-10 13:30
America/New York
Friday, 10 February 2012
510-4867333, at 18:30 (GMT), duration : 00:00
TimeTalkPresenter
13:30Y2013 Geometry-End game ( 00:20 ) 4 files
13:30CVS etc ( 00:20 ) 1 file
13:50Minutes ( 00:20 ) 1 file

HFT Software

2012-02-03 13:30
America/New York
Friday, 3 February 2012
510-4867333, at 18:30 (GMT), duration : 00:00

 

Agenda:

-Geometry:

a) get update on PXL sector material (cables etc) Flemming/Jonathan

b) what else is needed i) from our needs and ii) for the rest of STAR (upstream/downstream)

c) what we need in order to set up a simulation to check that by rotating in phi the SST/IST by a few degrees there is no significant impact on tracking efficiency for various pt bins.

- Manpower: Several people are coming onboard and we need to coordinate/match the needs with people. In the next month we will build on this initial discussion.

 

TimeTalkPresenter
13:30Geometry ( 00:20 ) 1 file
13:50Manpower Tasks/People ( 00:20 ) 0 files
14:10Minutes ( 00:20 ) 1 file

use of StarBASE to plot detector material

Comparison of Ped from runs 1302400, 13027029 and 13027045

Here's a comparison of runs 13024001, 13027029 and 13027045.  I regerated all the following pdf files now, so that the software used for all is up to date.  Note: run the earlier two runs

Some oddities from the test run

Here I collected some of the things that I didn't really understand from the 100 event test run that Gerard posted.

*** Master mapping FGT 2012

 This is the summary of mapping convention used for FGT in 2012

Attachemnts contain details strip/APV mapping for all quadrants, the same infor is in CSV table

Pedal QA for run GV_test2_r75_5tb_2

Pedestal QA for run GV_test2_r75_5tb_2.  Gerard took this run with 1 rdo using 5 time bins.  No RTS errors.


Added by Jan:

Wiring diagrams for the E880/C20 Polrimeter

Wiring diagrams for the E880 (a.k.a C20) polrimeter as it existed January 21st, 2011.  This is after the logic related to the hodoscopes was removed, but before the outputs to the C20 patch panel were removed (Jan 23) and before the additional gate was added before the scalar inhibits (Jan 27).

FGT Ramping Results

HV was ramped successfully for all 14 quarter sections. Here are the details:

Minutes


Talk time : 14:10, Duration : 00:20

How to access a webpage from linux shell

I just learned this.  To access a webpage from a linux shell use

How to make root file from FGT cosmic data

Here's how to use the StFgtDaq2RootMaker, which converts the fgt data in the daq file into a root file.

How to checkout StFgtDevel

Here's how to get the code in StFgtDevel/StRoot and compile it.

HV Ramping Progress

The following graph shows the voltage on channel U0 of the spare crate while ramping using the OFF/STANDBY/PHYSICS logic described earlier.

Complex FGT Ramp-Up

Complex FGT Ramp-Up

Draft of FGT Gas Supply Operations for Detector Operators

 I have attached a draft of the FGT Gas Supply Operations for Detector Operators.  Please have a look.  Comments are welcome.

Nuclear Physics Seminar Abstract and Slides

Run 9 200GeV RFF Dijet Asymmetries: First Look

Here I take a first (very preliminary) look at the dijet asymmetries in the RFF field configuration ...

 

Relative Luminosity - IV

HLT/CA in STAR

Speaker : TBC


Talk time : 09:40, Duration : 00:20