HFT Software
Updated on Mon, 2012-01-30 10:37. Originally created by margetis on 2012-01-30 10:37.510-4867333, at 18:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
13:30 | Y2013 Geometry-End game ( 00:20 ) 4 files | |
13:30 | CVS etc ( 00:20 ) 1 file | |
13:50 | Minutes ( 00:20 ) 1 file |
HFT Software
Updated on Mon, 2012-01-30 17:03. Originally created by margetis on 2012-01-30 10:37.510-4867333, at 18:30 (GMT), duration : 00:00
Agenda:
-Geometry:
a) get update on PXL sector material (cables etc) Flemming/Jonathan
b) what else is needed i) from our needs and ii) for the rest of STAR (upstream/downstream)
c) what we need in order to set up a simulation to check that by rotating in phi the SST/IST by a few degrees there is no significant impact on tracking efficiency for various pt bins.
- Manpower: Several people are coming onboard and we need to coordinate/match the needs with people. In the next month we will build on this initial discussion.
Time | Talk | Presenter |
---|---|---|
13:30 | Geometry ( 00:20 ) 1 file | |
13:50 | Manpower Tasks/People ( 00:20 ) 0 files | |
14:10 | Minutes ( 00:20 ) 1 file |
Comparison of Ped from runs 1302400, 13027029 and 13027045
Here's a comparison of runs 13024001, 13027029 and 13027045. I regerated all the following pdf files now, so that the software used for all is up to date. Note: run the earlier two runs
Some oddities from the test run
Here I collected some of the things that I didn't really understand from the 100 event test run that Gerard posted.
*** Master mapping FGT 2012
This is the summary of mapping convention used for FGT in 2012
Attachemnts contain details strip/APV mapping for all quadrants, the same infor is in CSV table
Pedal QA for run GV_test2_r75_5tb_2
Pedestal QA for run GV_test2_r75_5tb_2. Gerard took this run with 1 rdo using 5 time bins. No RTS errors.
Added by Jan:
Wiring diagrams for the E880/C20 Polrimeter
Updated on Sat, 2012-01-28 15:25. Originally created by sgliske on 2012-01-28 03:07.Wiring diagrams for the E880 (a.k.a C20) polrimeter as it existed January 21st, 2011. This is after the logic related to the hodoscopes was removed, but before the outputs to the C20 patch panel were removed (Jan 23) and before the additional gate was added before the scalar inhibits (Jan 27).
FGT Ramping Results
HV was ramped successfully for all 14 quarter sections. Here are the details:
Minutes
Updated on Fri, 2012-01-27 15:55. Originally created by margetis on 2012-01-27 15:55.Reference
Talk time : 14:10, Duration : 00:20
How to access a webpage from linux shell
I just learned this. To access a webpage from a linux shell use
How to make root file from FGT cosmic data
Here's how to use the StFgtDaq2RootMaker, which converts the fgt data in the daq file into a root file.
How to checkout StFgtDevel
Here's how to get the code in StFgtDevel/StRoot and compile it.
HV Ramping Progress
The following graph shows the voltage on channel U0 of the spare crate while ramping using the OFF/STANDBY/PHYSICS logic described earlier.
Complex FGT Ramp-Up
Updated on Thu, 2012-01-26 16:33. Originally created by pnord on 2012-01-26 16:33.Draft of FGT Gas Supply Operations for Detector Operators
I have attached a draft of the FGT Gas Supply Operations for Detector Operators. Please have a look. Comments are welcome.
Run 9 200GeV RFF Dijet Asymmetries: First Look
Here I take a first (very preliminary) look at the dijet asymmetries in the RFF field configuration ...