Adjusting BEMC Gain Widths in Simulation (Updated 04/10)
One suggested contributor to the simulation-data disagreement I see with the pi0's is the width of the BEMC gain distribution, with the gains possibly distributed too narrowly in simulation.
Spacer grid with very thin grids
Spacer grid prototype for SBS project at Hall A and ANDY (University of Virginia).
Coffee Break
Updated on Sat, 2012-04-07 13:49. Originally created by rfatemi on 2012-04-07 13:49.Reference
Talk time : 14:50, Duration : 00:20
2011 Transverse W
Updated on Wed, 2012-04-18 12:19 by smirnovd. Originally created by rfatemi on 2012-04-07 13:42.Reference
Speaker : Dima Smirnov and Salvatore Fazio
Talk time : 13:30, Duration : 00:30
Lunch
Updated on Fri, 2012-04-13 07:37. Originally created by rfatemi on 2012-04-07 13:40.Reference
Talk time : 12:15, Duration : 01:30
Slow control status / plans
Updated on Mon, 2012-04-16 09:11 by pnord. Originally created by surrow on 2012-04-06 18:32.Reference
Speaker : Paul Nord ( Valparaiso University )
Talk time : 10:55, Duration : 00:20
LS Solution for Cross Section and Asyms
The attached document describes the least squares solution for estimating the cross section and longitudinal spin asymmetries.
Minutes
Updated on Mon, 2012-04-09 11:41. Originally created by margetis on 2012-04-06 14:33.Reference
Talk time : 15:00, Duration : 00:20
Jan Rus., H.M., Jonathan, Spiros, Hao, HGR, Leo, Ernst, Xin,
Flemming, (HW +JT blocked out !!)
3 chip ladder survey/programming
Updated on Fri, 2012-04-06 14:32. Originally created by margetis on 2012-04-06 14:32.Simulation of prototype - first look
Updated on Fri, 2012-04-06 14:29. Originally created by margetis on 2012-04-06 14:26.EEMC pi0 Cross Section and Spin Asyms -- Pass 1
The point of pass 1 is to make sure all issues are brought to the table, and that the code structure is ready to get the final result. Pass 1 is now complete, and the next step is to improve the major problem areas and solve the open issues.
SSD Alignment Status
Updated on Fri, 2012-04-06 14:25 by margetis. Originally created by matis on 2012-04-06 12:12.Pixel Callibration
Test ladder measurement:
http://drupal.star.bnl.gov/STAR/system/files/ladder.pdf
Dinner / Beer
Updated on Thu, 2012-04-05 12:55. Originally created by surrow on 2012-04-05 12:55.Reference
Talk time : 18:15, Duration : 02:00
Discussion on future institutional responsibilities
Updated on Thu, 2012-04-05 12:54. Originally created by surrow on 2012-04-05 12:48.Reference
Speaker : ALL ( ALL )
Talk time : 17:45, Duration : 00:30
DAQ issues requiring repair during summer 2012
Updated on Mon, 2012-04-16 15:49 by gvisser. Originally created by surrow on 2012-04-05 12:47.Reference
Speaker : Gerard Visser ( IU CCEM / ANL )
Talk time : 17:15, Duration : 00:30
ARC re-design
Updated on Thu, 2012-04-05 12:46. Originally created by surrow on 2012-04-05 12:46.Reference
Speaker : Gerard Visser / Andrew Krebs ( IU CCEM / ANL )
Talk time : 16:45, Duration : 00:30
Schedule
Updated on Sun, 2012-04-15 21:40. Originally created by surrow on 2012-04-05 12:45.Reference
Speaker : Bernd Surrow ( Temple University )