Ultra-peripheral Collisions
Updated on Thu, 2011-11-10 16:56. Originally created by wlodek on 2011-11-10 16:56.Time | Talk | Presenter |
---|---|---|
09:00 | Central Production Double Diffraction Dissociation process in Run 12 in pp ( 00:15 ) 1 file | Leszek Adamczyk (Cracow) |
09:15 | New Analysis ( 00:30 ) 1 file | Spencer Klein (LBNL) |
09:45 | 62 GeV paper update ( 00:15 ) 0 files | Janet Seger (Creighton) |
10:00 | Embedding and tracking status update ( 00:15 ) 1 file | Ramiro Debbe (BNL) |
10:15 | Creation of pico-dst ( 00:15 ) 2 files | Dilan (Creighton) |
10:30 | Coffee Break ( 00:30 ) 0 files | (Bldg 50) |
11:00 | Rho diffraction analysis ( 00:30 ) 1 file | Ramiro Debbe (BNL) |
11:30 | J/psi and rho analysis ( 00:15 ) 1 file | Janet Seger (Creighton) |
11:45 | e+e- analysis (particle ID) ( 00:15 ) 1 file | Janet Seger (Creighton) |
Ultra-peripheral Collisions
Updated on Thu, 2011-11-10 16:54. Originally created by wlodek on 2011-11-10 16:54.Time | Talk | Presenter |
---|---|---|
09:30 | Update from Donika ( 00:20 ) 1 file | Donika Plyku (ODU) |
09:50 | Update from Ivan ( 00:30 ) 1 file | Ivan Koralt (ODU) |
11:00 | A_N results ( 00:40 ) 1 file | Kin Yip (BNL) |
11:40 | Run 12 plan and goals ( 00:20 ) 1 file | Stephen Bueltmann (ODU) |
14:00 | Discussion of run 12 ( 00:30 ) 0 files | All (All) |
Performance Evaluation from PWG
Updated on Thu, 2011-11-10 17:03 by akesich. Originally created by barannik on 2011-11-10 12:00.Reference
Speaker : Paul/Ramiro/Feng/Anthony/Grant/Duncan
Talk time : 16:30, Duration : 01:00
Anthony (Heavy Flavor):
Performance Evaluation from S&C team
Updated on Thu, 2011-11-10 11:59. Originally created by barannik on 2011-11-10 11:59.Reference
Speaker : Jason/Yuri/All
Talk time : 15:30, Duration : 01:00
Talk drafts for theGeneral introductions session
Updated on Thu, 2011-11-10 12:29 by perev. Originally created by barannik on 2011-11-10 11:57.Reference
Speaker : Jason/Victor/Ivan/Yuri
Talk time : 14:30, Duration : 01:00
Draft of the AgML Overview Talk
Tracking Eval meeting #9
Updated on Thu, 2011-11-10 11:55. Originally created by barannik on 2011-11-10 11:55.1-189, at 19:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
14:30 | Talk drafts for theGeneral introductions session ( 01:00 ) 2 files | Jason/Victor/Ivan/Yuri |
15:30 | Performance Evaluation from S&C team ( 01:00 ) 0 files | Jason/Yuri/All |
16:30 | Performance Evaluation from PWG ( 01:00 ) 1 file | Paul/Ramiro/Feng/Anthony/Grant/Duncan |
HFT meeting
BKDG 70A-3377 Berkley , CA, at 14:00 (GMT), duration : 00:00
Quarterly face to face technical meeting.
HFT face to face meeting LBNL November 14
Note drupal talks entry at end of this page.
The times are meant primarily to reflect the order, not
nesc. the allotted time . Particular for the focus subject we should spend the time needed.
Monday
9.00 Overview - flemming videbaek
9.30 PXL Leo Greiner
10.00 IST Gerrit
10.30 Coffe break
10.30 Integration , Clean room: Dana Beavis
Discussion.
11.30 Engineering needs for next year, coordination. Eric A. Input from sub-systems.
12.30 Lunch
13.30 Budget and schedule status Sarah Morgan
14.00 SSD Jim Thomas
14.30 Survey requirements. Input from each sub-system. Discussion
Tracking requirements (Spiros)
Mechichal tolerance and accuracy ( Eric)
Draft Plans from PXL, IST and SSD
16.00 Break
16.30 Software
17.00 Slow control and Online discussion.
Input from disc. With S&C (spiros)
Status and plans PXL, ISt and SSD.
Status updates on technical progress from each sub-system, but excluding material from the focus subject. For the focus subject I would like to assemble material into a common document/presentation so all is available at once. Format to be decided, but probably a pdf with tabs per sub-system.
Suggested point for sub-systems
PXL, IST, SSD
· Status of grounding plan
· Schedule status compared to baseline.
· Critical items
· Review and update of Risk list for your system
Integration
· Schedule status compared to baseline.
· Critical items
· Review and update of Risk list for your system
· New beam pipe plans
Suggested focus Subjects:
· Survey requirements, and plans for doing this. The outcome should be an established baseline plan, such that we are on a common basis. If there are open issues evaluate when this will be resolved.
· Mech. engineering needs, expected CF shop needs for coming year.
· Slow Control needs, plans, man-power.
· Online QA (non-expert)
· Clean room needs - space, utilities, schedule for this.
· Integration volumes/boundaries for sub-systems. Case in point is change in available SSD volume in WSC. The final design should have been had formal signoff.
- EVO information
Title: HFT meeting
Description: face to face
Community: STAR
Password: star
Meeting Access Information:
- Meeting URL
http://evo.caltech.edu/evoNext/koala.jnlp?meeting=MaMDMt2I2tDBDe9v9aDI9a
- Password: star
- Phone Bridge
ID: 429 8281
Password: 0952
Eastern Standard Time (-0500)
Start 2011-11-14 08:30
End 2011-11-14 18:30
Japan Standard Time (+0900)
Start 2011-11-14 22:30
End 2011-11-15 08:30
Central European Time (+0100)
Start 2011-11-14 14:30
End 2011-11-15 00:30
Pacific Standard Time (-0800)
Start 2011-11-14 05:30
End 2011-11-14 15:30
EVO Phone Bridge Telephone Numbers:
---------------
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
- USA (BNL, Upton, NY)
+1 631 344 6100
I guess I booked it from 8.30 EST - but EVO is forgiving.
Time | Talk | Presenter |
---|---|---|
09:00 | Overview ( 00:20 ) 1 file | Flemming Videbaek |
09:30 | PXL status ( 00:30 ) 1 file | Leo Greiner |
10:00 | IST report ( 00:30 ) 1 file | Gerrit J. van Nieuwenhuizen II (MIT) |
11:00 | Integration ( 00:30 ) 1 file | Dana Beavis |
11:30 | Global Support Structure ( 00:45 ) 1 file | Eric Anderssen |
13:30 | Budget and schedule status ( 00:30 ) 1 file | Sarah Morgan |
14:00 | SSD overview ( 00:40 ) 2 files | Jim Thomas & Micheal LeVine |
14:40 | Survey discussions ( 01:20 ) 3 files | Spiros/Howard etc |
16:30 | Software, progress, plans ( 00:30 ) 1 file | Spiros Margetis |
17:00 | Slow control and online software ( 00:20 ) 0 files |
Conveners-Management Lunch Meeting
Updated on Wed, 2011-11-09 12:11. Originally created by dongx on 2011-11-09 12:11.Status for Review
Updated on Wed, 2011-11-09 11:01. Originally created by avossen on 2011-11-09 11:01.Comparing r5
Updated on Wed, 2011-11-09 17:26. Originally created by jhlee on 2011-11-09 10:22.2011 BNL local group presentations #14: An Endcap TOF and TRD for Identifying Electrons at EIC
Updated on Wed, 2011-11-09 10:34. Originally created by jeromel on 2011-11-09 10:07.1-189, at 20:00 (GMT), duration : 01:00
Presentation by Ming Shao, from USTC.
Charge-to-neutral Correlation (Evo)
Updated on Tue, 2011-11-15 23:33 by ptribedy. Originally created by cebra on 2011-11-09 01:34.Reference
Speaker : Prithwish Tribedy ( Kolkata )
Talk time : 22:00, Duration : 00:30
Phi Meson V2 (Evo)
Updated on Wed, 2011-11-09 01:15. Originally created by cebra on 2011-11-09 01:15.Reference
Speaker : Md. Nasim ( Kolkata )
Talk time : 21:30, Duration : 00:30
Net-charge higher moments analysis (Evo)
Updated on Tue, 2011-11-15 22:57 by nihar. Originally created by cebra on 2011-11-09 01:14.Reference
Speaker : Nihar Sahoo ( Kolkata )
Talk time : 21:00, Duration : 00:30
Net-proton Higher Moments (Evo)
Updated on Tue, 2011-11-15 23:22 by luoxf. Originally created by cebra on 2011-11-09 01:13.Reference
Speaker : Xiaofeng Luo ( Central China Normal University )
Talk time : 20:30, Duration : 00:30
Particle Ratio Fluctuations (Evo)
Updated on Sun, 2011-11-27 23:07 by tian. Originally created by cebra on 2011-11-09 01:08.Reference
Speaker : Jian Tian ( Shanghai SINAP )
Talk time : 20:00, Duration : 00:30
Dinner
Updated on Wed, 2011-11-09 01:06. Originally created by cebra on 2011-11-09 01:06.Reference
Talk time : 16:00, Duration : 04:00
QM 2012 Plan - And other upcoming conferences
Updated on Wed, 2011-11-09 01:16. Originally created by cebra on 2011-11-09 01:03.Reference
Speaker : All
Talk time : 15:30, Duration : 00:30
Run12 preparation, physics goals, trigger/bandwidth need.
Updated on Tue, 2011-11-15 19:00. Originally created by cebra on 2011-11-09 01:02.Reference
Speaker : All
Talk time : 15:00, Duration : 00:30
Discussion of Papers Status
Updated on Tue, 2011-11-15 23:07. Originally created by cebra on 2011-11-09 01:01.Reference
Speaker : All ( All )
Talk time : 14:00, Duration : 01:00