Calibraton of TPC in asymmetric Cu+Au collisions
Updated on Wed, 2014-10-08 07:46. Originally created by pfederic on 2014-09-26 13:20.EPD -- Geant Simulation Update
Updated on Fri, 2014-09-26 12:47. Originally created by iupsal on 2014-09-26 12:47.
Possibilities on GridLeak saturation
Updated on Fri, 2014-09-26 10:59. Originally created by genevb on 2014-09-26 10:41. Relevant observations that have inspired this:
- The SpaceCharge and GridLeak luminosity offsets (SO and GLO respectively) show clear separation, with GLO values lower than SO <
Rona Pot Phase II* status report
Updated on Fri, 2014-09-26 09:34. Originally created by wlodek on 2014-09-26 09:34.Reference
Speaker : Wlodek Guryn
Talk time : 11:00, Duration : 00:20
measurements of clock jitter at BTOW crate
Updated on Mon, 2014-10-06 10:17. Originally created by gvisser on 2014-09-25 21:24.
IST Sti Geometry: ISCT, IST short cooling tube
Updated on Thu, 2014-09-25 17:41. Originally created by smirnovd on 2014-09-25 17:17.This is a test 1
Updated on Thu, 2014-09-25 14:25. Originally created by testadmin on 2014-09-25 12:26.Just to see - this test will create a page and check if the grant module update fixed the issue I saw before (a page may become invisible).
Run12 Collins Analysis: PWG Update
Updated on Thu, 2014-09-25 10:39. Originally created by jkadkins on 2014-09-25 10:13.
simulation/BaseQA with latest bug fixes
Updated on Thu, 2014-09-25 10:04. Originally created by bouchet on 2014-09-25 10:04.Speaker : jonathan
Talk time : 15:00, Duration : 00:20
FMS and Jet Summary Reports for Spin Meeting
Updated on Thu, 2014-12-11 11:56. Originally created by gdwebb on 2014-09-25 09:45.
HFT soft effort steering meeting
Updated on Thu, 2014-09-25 08:00. Originally created by genevb on 2014-09-25 07:57. 2014-09-25 15:00
2014-09-25 17:00
America/New York
Thursday, 25 September 2014
1-165, at 19:00 (GMT), duration : 02:00
1-165, at 19:00 (GMT), duration : 02:00
- Phone Bridge
ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
______________
ID: 1096183
EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100
- USA (Caltech, Pasadena, CA)
+1 626 395 2112
______________
Time | Talk | Presenter |
---|---|---|
15:00 | simulation/BaseQA with latest bug fixes ( 00:20 ) 1 file | jonathan |
09/24/2014 spinPWG meeting --Forward Inclusive π0 AN and π0 Collins at 500 GeV
Updated on Thu, 2014-09-25 12:29. Originally created by yuxip on 2014-09-25 00:37.Bunch Fitting Summary For Spin PWG Meeting
Updated on Thu, 2014-09-25 09:45. Originally created by dilks on 2014-09-24 17:31.Run12 Inclusive Jet A_LL Updates -09/25
Updated on Thu, 2014-09-25 00:29. Originally created by zchang on 2014-09-24 16:06.