FPS FEE BUS CONTROL CCA (TUFF CARD) Schematic JULY 23 2014

 

 This is nearing the final design for TUFF control box and power distribution to FPS FEE's

FPS TUFF CCA JUL 23 2014

 
 This is nearing the final design for TUFF control box and power distribution to FPS FEE's
 
 

FPS TUFF CCA JUL 23 2014

 
 This is nearing the final design for TUFF control box and power distribution to FPS FEE's
 
 

Testing stiscan with geant steps tree

The following images show energy deposited in some Sti volumes for what supposed to be a similar set of tracks, i.e. track generated at z=-3 cm perpendicular to the beam.

STAR Management Meeting

2014-07-31 10:50
2014-07-31 13:00
America/New York
Thursday, 31 July 2014
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10

STAR Management Meeting

2014-07-24 10:50
2014-07-24 13:00
America/New York
Thursday, 24 July 2014
SeeVogh ID: 100 4432 (BNL RM#1-189), at 14:50 (GMT), duration : 02:10

1) Roman Pot Upgrade status report (Wlodek)
https://drupal.star.bnl.gov/STAR/blog/videbaks/progress-reports-run-15-upgrades 

2) discussions/responses to ALD's requests


3) production/topic priority from PWGC

4) upgrade and collaboration meetings
Upgrade workshop October 2-3, Chicago
Collaboration meeting, November 3-8, BNL

5) new collaboration institutions, requests
https://drupal.star.bnl.gov/STAR/system/files/Info_to_join_STAR_letter_Yi_Yang.docx 

6) Other items

Thanks!

Zhangbu

Bam halo and accidentals in 2009 (update)

Speaker : Leszek Adamczyk (AGH-UST cracow)


Talk time : 16:50, Duration : 00:10

Transition to ops, lessons leraned and Contingency expenditure

Speaker : F.Videbaek + all


Talk time : 13:40, Duration : 00:20

 

SSD status requirements and deliverables

Speaker : J.Thomas


Talk time : 13:20, Duration : 00:20

 

IST status, requirements and deliverables

Speaker : Zhenyu Ye


Talk time : 13:00, Duration : 00:20

 

PXL status, requirements and deliverables

Speaker : Leo Greiner


Talk time : 12:40, Duration : 00:20

 

Cost and Schedule

Speaker : Sarah Morgan


Talk time : 12:20, Duration : 00:20

 

HFT status and overview

Speaker : F.Videbæk


Talk time : 12:00, Duration : 00:20

 

HFT dry run

2014-07-24 13:00
America/New York
Thursday, 24 July 2014
2-219, at 17:00 (GMT), duration : 00:00
 The dry runs will be held over two days:
 Thursday and Friday Connection will be by phone bridge
Tlaks will not nesc be given in order


TimeTalkPresenter
12:00HFT status and overview ( 00:20 ) 2 filesF.Videbæk
12:20Cost and Schedule ( 00:20 ) 2 filesSarah Morgan
12:40PXL status, requirements and deliverables ( 00:20 ) 3 filesLeo Greiner
13:00IST status, requirements and deliverables ( 00:20 ) 2 filesZhenyu Ye
13:20SSD status requirements and deliverables ( 00:20 ) 2 filesJ.Thomas
13:40Transition to ops, lessons leraned and Contingency expenditure ( 00:20 ) 1 fileF.Videbaek + all
14:00Project Closeout report ( 00:20 ) 1 file

Particle spetra in SDD (2009 data)

Speaker : Lukasz Fulek ( AGH-UST )


Talk time : 16:30, Duration : 00:20

 

SSD Sti Geometry

SST Sti Geometry

Updated SST Sti geometry

/star/institutions/ksu/bouchet/S

PWGC Meeting

2014-07-22 11:00
2014-07-22 12:30
America/New York
Tuesday, 22 July 2014
, at 15:00 (GMT), duration : 01:30
 --- PWGC Agenda  July 22, 2014 ---
 
1) BUR 15/16: final PAC report was released two weeks ago and can be found at the following link
    Huan Huang is a member of the PAC and has agreed to join our meeting to further discuss this.
 
2) Production Priorities.
  Thank you for posting the priorities. I have listed below the feedback that I have received
 
3) STAR CVS repository and binary files. A combination that we should try to avoid, see Jerome's message:
 
4) AOB

---- SeeVogh details ----

Title:          STAR PWGC Meeting
Description:    PWGC conveners' weekly meeting
Community:      STAR
Password:       starpwgc
Meeting type: Open Meeting (Round Table)

Meeting Access Information:
- Meeting URL
  SeeVogh R.N.
http://research.seevogh.com/join?meeting=3D3D3D3D3DMaMDMt222uDvD89D9iDI9a
  EVO International

http://evo.caltech.edu/evoNext/koala.jnlp?meeting=3D3D3D3D3DMaMDMt222uDvD8
9D9iDI9a

- Password: starpwgc
- Phone Bridge
   ID: 100 3600
   Password: 8682

SeeVogh Research Network Phone Bridge Telephone Numbers:
---------------
- USA (Caltech, Pasadena, CA)
  +1 626 395 2112

- USA (BNL, Upton, NY)
  +1 631 344 6100

- Skype (tm) (World-wide)
  evo.phone
  See:
http://evo.caltech.edu/evoGate/Documentation/extclient/skype/skype.html
 

Survey Measurment

Speaker : Guannan Xie


Talk time : 14:10, Duration : 00:20

 

SSD code update

Speaker : joanthan


Talk time : 13:50, Duration : 00:20

 

HFT Pixel Survey report July17