Upsilons in U+U - Simultaneous fit and separation of 1S

Material for the Feb2015 regional meeting in Prague, and for the PWG

tracking update

Speaker : Hao Qiu


Talk time : 11:20, Duration : 00:20

Last Friday Victor posted out his blog about committing the changes I proposed.
https://drupal.star.bnl.gov/STAR/blog/perev/sti-diary

Masking Update

Speaker : Michael L.


Talk time : 11:00, Duration : 00:20

 

2009 jet luminosity study

 

Intrinsic Noise Stability

Forward Upgrade Proposal / Schedule + Milestones - GEM option

EPD metting Feb 11th- Technical drawings

 

PWGC Meeting

2015-02-10 11:00
2015-02-10 12:30
America/New York

 

--- Agenda ---

1) 14.5GeV - PWG QA

DCA Tips and tricks with HFT

 

Speaker : Spiros Margetis ( Kent State )


Talk time : 11:00, Duration : 00:20

SSD software update

Speaker : Long


Talk time : 17:10, Duration : 00:20

STAR Weekly IST Meeting Minutes 02/09/2015

 1. Operations, IST Alarm Test (Xiaozhi)
1) No issue on IST operations, first collisional data taken with IST today 9-11am today.

Progress on Gamma-Jet Nov. 2014

Run15 cdev monitor

The spin pattern of run15 are expected to repeat every  24 bunches. 

The following slide is from Elke's slides:  

run 14 : offline cuts studies + hot chip tables

Speaker : jonathan


Talk time : 16:50, Duration : 00:20

 

run 15 ZF

Speaker : jonathan


Talk time : 16:30, Duration : 00:20

 

2009 jet luminosity discussion - round 2

 

Heavy Flavor publication plan

IST operation_2_9

 

STAR General Overview

Run 15 timing scans, etc.

  Attached are initial Run 15 pp 200 GeV crate level plts/nominal running phases with
caveats (these are from auto_scan run #16039029):