Dilepton Trigger Run 14 (Bill's slides from 05/03/2014)


Talk time : 10:55, Duration : 00:20

 

exclusivity cut

Speaker : Leszek Adamczyk (AGH-UST)


Talk time : 10:50, Duration : 00:05

Calibration status update for Run 14 AuAu datasets

  •  14.6 GeV AuAu

SSD Geometry


Talk time : 10:00, Duration : 00:20

 

iTPC insertion tool

2014-12-17 12:30
America/New York
Wednesday, 17 December 2014
2-78 at BNL, at 17:30 (GMT), duration : 00:00
Insertion tooling has been completed and arrived at BNL  5/12/2017

A few pictures


First attempts to unload



second and successful attempt


tooling out of car



-----------------------------------------------------------------
old meeting: notes   12/17/2014

First review of concepts of iTPC insertion tooling


Agenda:

1) Discussion about the design of the iTPC sector insertion tool for STAR - R.Sharma - 25 mins
2) Analysis of the sector insertion tool and comparing the final deflection numbers with clearances -  R.Sharma - 25 mins
3) Clean room environment requirements - R. Brown - 25 mins
4) Scaffolding requirements - R. Brown - 25 mins
5) Schedule - R. Brown - 10 mins
6) Break - 10 mins
7) Reviewer Questions, Comments and Closeup - 60 mins



Meeting minutes will be taken by Flemming. We will start at 12:30pm EST and we will be done by 3:30pm EST. Please try to go over the presentation file in advance. I appreciate everyone making time for this review. 


Presentation by Rahul & Ralph
Notes from meeting (FV)

Away-side jet correlations 1216 2014

 

Trigger for run 15

Speaker : Igor Alekseev ( ITEP )


Talk time : 10:30, Duration : 00:20

A revised version of trigger presentation.

Run-11 Transverse Jets: Slides for PWGC Preview

 

Run 9 200GeV Dijet Cross Section: Integrated Luminosity Systematic

Hopefully the last discussion on how to quantify the systematic error associated with the extraction of the integrated luminosity ...

Run12 Calibration: New Fits

 

2011+2012 Collins Figure for Spin White Paper

Posted below in Fig. 1 and attached at the bottom of the blog is a proposed figure for the RHIC Spin White Paper.

PWGC Meeting

2014-12-16 11:00
2014-12-16 13:00
America/New York

--- Agenda ---

1) Run-14 production status

FMS Simulation Issues

 The problem that we notices in last weeks FMS meeting was that there appeared to be a strange cutoff in the per-tower simulation at 50 GeV.

2012 - Relative Luminosity Plots

IFF paper drafts

 

IST Sti Geometry

Version 1: Simplified

Run-11 Transverse Jets: Smoothing Kinematic Shifts

Given the limitations of my embedding sample, it is important to try to use the available statistics most efficiently. One way to do this is to utilize fits to the data trends.

Trigger Board Meeting for Run15

2014-12-15 12:30
2014-12-15 14:00
America/New York
Monday, 15 December 2014
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 17:30 (GMT), duration : 01:30
- Machine and detector status (Bill)

- Test configuration: pp_2015_strawman (Jeff) 
http://www.star.bnl.gov/HyperNews-star/protected/get/triggerboard/1032.html

-
 AOB

RP Phase II* status

Speaker : Wlodek Guryn


Talk time : 11:00, Duration : 00:20

 

d+Au Ridge paper II GPC Meeting III