Feb 26th Run 15 pp status

NPE in central UU collisions - update

Feb 26 2015 HF PWG Update

 

jetMeetingSimUpdate 2/25/15

 found an error so this is wrong

OSU EPD Testbench, EPD meeting Feb25 2015

 

IST timebin study

Speaker : Bingchu Huang


Talk time : 12:00, Duration : 00:20

 

D0 reconstruction in Hijing simulations


Talk time : 11:40, Duration : 00:20

 

GEANT4 study of IT/ET issue

Speaker : Lukasz Fulek ( AGH-UST )


Talk time : 11:10, Duration : 00:10

 

Pxl masking

Speaker : Flemming


Talk time : 11:20, Duration : 00:20

 

AOB

Speaker : All ( All )


Talk time : 12:55, Duration : 00:05

  • Production of the 2014 data on going - see summary here.
  • Note that use

Online Control System project status

Speaker : Dmitry Arkhipkin ( BNL )


Talk time : 12:35, Duration : 00:20

HFT in tracking, summary

Speaker : Jason Webb ( BNL )


Talk time : 12:15, Duration : 00:20

News from the front

Speaker : Salvatore Fazio ( BNL )


Talk time : 12:00, Duration : 00:15

Software and Computing Meeting

2015-02-25 12:00
2015-02-25 13:00
America/New York
Wednesday, 25 February 2015
1-189, SRN, at 17:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00News from the front ( 00:15 ) 2 filesSalvatore Fazio (BNL)
12:15HFT in tracking, summary ( 00:20 ) 2 filesJason Webb (BNL)
12:35Online Control System project status ( 00:20 ) 1 fileDmitry Arkhipkin (BNL)
12:55AOB ( 00:05 ) 0 filesAll (All)

Embedding with Pxl

Speaker : Amilkar


Talk time : 11:00, Duration : 00:20

 

Elastic scattering

Speaker : Igor Alekseev


Talk time : 11:00, Duration : 00:10

Trigger goals

Speaker : Igor Alekseev


Talk time : 10:50, Duration : 00:10

Iteration1

 The results from iteration1 have been analyzed.
The result ing HTML file after calculations is found at

W+/- Cross Section Ratio DIS 2015 Version-5

 

Run 13 BEMC Calibration : Relative Calibration [MIP analysis]

Run 13 BEMC Calibration : Relative Calibration [MIP analysis]  
Run-13 -Period1 BEMC-Calibration
Distributions requested by EMC meeting on 11/10/15 of various trigger options : (click here)
 
 

*******************
cluster_eng_momentum_cut_for_outtermost2_eta_rings

EMC-draft-08-18-15


compare <E/P> vs 1/3x3 isolation ratio (ratio-not corrected) between E in <E/P> is corrected single tower energy  and  E in <E/P> being non-corrected 2x2 cluster energy. ---plots
 
clusterEng_E/Pfit_ringbyring

2x2cluserEng VS TDR and singleTowerEng Vs TDR

TDR-Vs-1/3x3_isolation

TDR-1D distribution_ring-by-ring--BHT3 trigger 

 

 




MIP-Gain-Luminosity dependance-period1
zdc1 -> <zdc> ~200K - (MIPGain
zdc1 -MIPGainzdc2)/ MIPGainzdc1 


 

BHT3 - threshold=7.3 GeV

conditions:

if  ( ( (BHT3&&BHT3->DidFire()) && !(BHT2&&BHT2->DidFire()) &&
!(BHT1&&BHT1->DidFire()) &&  !(BHT0&&BHT0->DidFire() ) )
   {
 BHT3->Fill();


EoverPvsP      meanE/PvsP

********************************
BHT2- 
threshold=6.0 GeV
condition:

if ( ( (BHT2&&BHT2->DidFire()) && !(BHT1&&BHT1->DidFire()) &&
!(BHT0&&BHT0->DidFire() ) )
       {
 BHT2->Fill();

EoverPvsP      meanE/PvsP
********************************

BHT1 - 
threshold=4.2 GeV
condition:

if ( ( (BHT1&&BHT1->DidFire()) && ! (BHT0&&BHT0->DidFire() ) )
    {
 BHT1->Fill();

EoverPvsP      meanE/PvsP

********************************
BHT0 - 
threshold=2.6 GeV
condition:
if  (BHT0&&BHT0->DidFire())  BHT0->Fill()

EoverPvsP      meanE/PvsP

********************************

JP2
Condition:
if  (JP2&&JP2->DidFire())  JP2->Fill()

EoverPvsP   Mom-5-10   Mom-7-10  meanE/PvsP