Anti-Lambda in Au+Au 15 GeV run14
Updated on Sat, 2015-04-18 07:39 by zhux. Originally created by huangbc on 2015-03-03 15:45.Lambda in Au+Au 15 GeV run14
Updated on Sat, 2015-04-18 07:38 by zhux. Originally created by huangbc on 2015-03-03 15:44.P14ii
production_15GeV_2014
Trigger: 440005, 440015 (BBC_MB), 440001 (VPD_MB), and 440004 (ZDC_MB)
|Vz|<70 cm, Vr (to 0,-0.89cm)<1 cm
|y|<1
0<pT < 7 GeV/c
5%*refmult embedded particles per event
500K flat, 500K exponential (T~350 MeV)
Request ID | 20151001 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | Base QA Done, producing larger sample [5/7] |
Physics Working Group | Light Flavor Spectra |
Requested by | huangbc |
Contact email(s) | huangbc@rcf.rchi.bnl.gov,musman_mughal10@yahoo.com |
Contact phone(s) | |
PWG email(s) | lfspectra-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup |
Particle | Alpha |
Particle settings | dalitz |
Particles per event | 1 |
Vertex Z, cm | -30 < Vertex < 30 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -0.5 < η < 0.5 |
Pt, GeV | 0 < Pt < 30 |
K0s in Au+Au 15 GeV run14
Updated on Sat, 2015-04-18 07:36 by zhux. Originally created by huangbc on 2015-03-03 15:42.P14ii
production_15GeV_2014
Trigger: 440005, 440015 (BBC_MB), 440001 (VPD_MB), and 440004 (ZDC_MB)
|Vz|<70 cm, Vr (to 0,-0.89cm)<1 cm
|y|<1
0<pT < 7 GeV/c
5%*refmult embedded particles per event
For each particle, 500K flat, 500K exponential (T~350 MeV)
Request ID | 20151001 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | Base QA Done, producing larger sample [5/7] |
Physics Working Group | Light Flavor Spectra |
Requested by | huangbc |
Contact email(s) | huangbc@rcf.rchi.bnl.gov,musman_mughal10@yahoo.com |
Contact phone(s) | |
PWG email(s) | lfspectra-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup |
Particle | Alpha |
Particle settings | dalitz |
Particles per event | 1 |
Vertex Z, cm | -30 < Vertex < 30 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -0.5 < η < 0.5 |
Pt, GeV | 0 < Pt < 30 |
iTP insertion tooling review
2015-03-05 13:30
America/New York
Thursday, 5 March 2015
2-84 BNL, at 18:30 (GMT), duration : 00:00
2-84 BNL, at 18:30 (GMT), duration : 00:00
This is the second insertion tooling review for conceptual design.
The notes from the meeting are attached here
The notes from the meeting are attached here
Time | Talk | Presenter |
---|---|---|
13:30 | insertion tool and integration ( 00:20 ) 1 file | Rahul Sharma |
Estimation of 2S+3S RAA values and limits
Updated on Tue, 2015-03-17 08:54. Originally created by rvertesi on 2015-03-03 05:00.Question whether we should go for 2S+3S RAA and/or limits. The 1st estimation (approx 20% accuracy) is in UpsExcStates14.
HFT hit selection
Updated on Tue, 2015-04-07 11:32. Originally created by perev on 2015-03-02 22:30.The last puzzle in Sti was HFT hits selections. We requested at least 4 HFT hits on track
but sometimes tracks was accepted with even 1 Hft hit. I spend a lot of time to understand,
Iteration4
Updated on Tue, 2015-03-03 21:19. Originally created by heppel on 2015-03-02 21:18.The result of analysis of iteration4 is below.The corrections from iteration4 to be used to set iteration5 voltages are Fms
Run14 Au+Au 200 GeV - T0 calibration using HFT
Updated on Mon, 2015-03-02 17:08. Originally created by mstftsm on 2015-03-02 17:06.
Regarding the T0 calibration.
Re-Study the internal busy effect
Updated on Mon, 2015-03-09 02:27. Originally created by zhoulong on 2015-03-02 15:40.newest one is in here :
Re-Study the internal busy effect
Updated on Mon, 2015-03-02 16:06. Originally created by zhoulong on 2015-03-02 15:39.Run 15 goals in center production
Updated on Mon, 2015-03-02 11:28. Originally created by igora on 2015-03-02 11:28.Speaker : Igor Alekseev
Talk time : 12:50, Duration : 00:10
IST
Updated on Mon, 2015-03-02 11:01. Originally created by xiao00 on 2015-03-02 11:01.Summary from last week:
Updated on Mon, 2015-03-02 10:55. Originally created by ypwang on 2015-03-02 10:55.Reference
Speaker : Yaping
Talk time : 11:00, Duration : 00:20
1). code review was done for IST fast simulation maker, and moved to DEV library on Feb. 26.
VPDMB Rate
Updated on Mon, 2015-03-02 09:31. Originally created by dongx on 2015-03-02 09:31.Speaker : Xin Dong
Talk time : 12:30, Duration : 00:20
iteration3
Updated on Mon, 2015-03-02 11:58. Originally created by heppel on 2015-03-02 01:13.This page represents the analysis of date taken after iteration3 voltages were set.
Trigger Board Meeting for Run15
Updated on Sun, 2015-03-01 14:38. Originally created by jhlee on 2015-03-01 14:38. 2015-03-02 12:30
2015-03-02 14:00
America/New York
Monday, 2 March 2015
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 17:30 (GMT), duration : 01:30
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 17:30 (GMT), duration : 01:30
Time | Talk | Presenter |
---|---|---|
12:30 | VPDMB Rate ( 00:20 ) 1 file | Xin Dong |
12:50 | Run 15 goals in center production ( 00:10 ) 1 file | Igor Alekseev |
13:00 | FMS triggers fro pA ( 00:20 ) 1 file | akio Ogawa |
EEMC Calibration Using Mip
Updated on Wed, 2015-04-15 15:09. Originally created by tinglin on 2015-03-01 12:40.
HFT preview data
Updated on Thu, 2015-03-19 09:14. Originally created by amcw7777 on 2015-02-27 15:22.
STAR Management Meeting
Updated on Thu, 2015-03-19 11:37. Originally created by xzb on 2015-02-26 16:51. 2015-03-20 12:00
2015-03-20 13:30
America/New York
Friday, 20 March 2015
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
1) run14 production status and next in priority discussions
2) run15 status
3) BUR