SSD Meeting
Updated on Sun, 2015-03-29 16:33. Originally created by margetis on 2015-03-29 16:33. 2015-05-25 17:30
America/New York
Monday, 25 May 2015
EVO, at 21:30 (GMT), duration : 00:00
EVO, at 21:30 (GMT), duration : 00:00
SSD Meeting
Updated on Sun, 2015-03-29 16:33. Originally created by margetis on 2015-03-29 16:33. 2015-05-18 17:30
America/New York
Monday, 18 May 2015
EVO, at 21:30 (GMT), duration : 00:00
EVO, at 21:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
17:30 | update ( 00:20 ) 1 file | jonathan |
17:50 | Proposal for CMN subtraction ( 00:20 ) 1 file | Jim Thomas |
SSD Meeting
Updated on Sun, 2015-03-29 16:33. Originally created by margetis on 2015-03-29 16:33. 2015-05-11 17:30
America/New York
Monday, 11 May 2015
EVO, at 21:30 (GMT), duration : 00:00
EVO, at 21:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
17:30 | software news ( 00:20 ) 2 files |
SSD Meeting
Updated on Sun, 2015-03-29 16:33. Originally created by margetis on 2015-03-29 16:33. 2015-03-30 17:30
America/New York
Monday, 30 March 2015
EVO, at 21:30 (GMT), duration : 00:00
EVO, at 21:30 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
17:30 | Bad Asic list (preliminary) ( 00:20 ) 3 files | Jim Thomas |
17:50 | update SSD-->SST ( 00:20 ) 1 file | jonathan |
Dmeson production at Run14 AuAu200 GeV
Updated on Thu, 2015-04-02 09:23. Originally created by zhoulong on 2015-03-27 20:34.Jie's QA
http://www.star.bnl.gov/protected/lfspectra/jiezhao/run14/production/main/mainQA.html
Di-lepton
TPC spatial distortions effects on pT
Updated on Tue, 2015-06-09 09:57. Originally created by genevb on 2015-03-27 16:40.The TPC measures sagitta, and determines pT from it:
LED Gains Run 16
Updated on Fri, 2015-03-27 10:00. Originally created by bsumma on 2015-03-26 22:42.Similar to what has been done in previous years (see for example Professor Heppelmann's page at https://drupal.star.bnl.gov/STAR/blog/heppel/2013/jun/19/ledtimedependence) we are interested in the tim
J/psi->ee in p+p 200 GeV run 12 (BHT2)
Updated on Mon, 2015-05-11 05:22 by zhux. Originally created by yezhenyu on 2015-03-26 14:50.J/psi->ee in p+p 200 GeV run 12 (BHT1)
Updated on Mon, 2015-05-11 05:21 by zhux. Originally created by yezhenyu on 2015-03-26 14:50.System: p+p
Energy: 200 GeV
Year: 2012
Library: SL12d
Production tag: P12id
Data stream: st_physics
Triggers: BHT1(370546)
Run range: 13039132 - 13072020
Number of events: 500k per Trigger
Particles: 5/event
Vertex: no vertex cut
Rapidity: |y|<1.2 flat
pt: 0-16 GeV/c flat
Request ID | 20151204 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | QA Sample Available, producing Base QA [4/7] |
Physics Working Group | Heavy Flavor |
Requested by | yezhenyu |
Contact email(s) | yezhenyu2003@gmail.com, bingchu@uic.edu |
Contact phone(s) | |
PWG email(s) | heavy-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup | |
Particle | J/psi |
Particle settings | Flat in Pt |
Particles per event | 5 |
Vertex Z, cm | -999 < Vertex < 999 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -1.2 < η < 1.2 |
Pt, GeV | 0 < Pt < 16 |
J/psi->ee in p+p 200 GeV run 12 (BHT0)
Updated on Thu, 2015-07-16 08:50 by zhux. Originally created by yezhenyu on 2015-03-26 14:50.System: p+p
Energy: 200 GeV
Year: 2012
Library: SL12d
Production tag: P12id
Data stream: st_physics
Triggers: BHT0(370542)
Run range: 13039132 - 13072020
Number of events: 500k per Trigger
Particles: 5/event
Vertex: no vertex cut
Rapidity: |y|<1.2 flat
pt: 0-16 GeV/c flat
Request ID | 20151203 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | Larger (or full) sample done, producing PWG QA [6/7] |
Physics Working Group | Heavy Flavor |
Requested by | yezhenyu |
Contact email(s) | yezhenyu2003@gmail.com, bingchu@uic.edu |
Contact phone(s) | |
PWG email(s) | heavy-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup | |
Particle | J/psi |
Particle settings | Flat in Pt |
Particles per event | 5 |
Vertex Z, cm | -999 < Vertex < 999 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -1.2 < η < 1.2 |
Pt, GeV | 0 < Pt < 16 |
J/psi->ee in p+p 200 GeV run 12 (MB)
Updated on Mon, 2015-06-22 07:22 by zhux. Originally created by yezhenyu on 2015-03-26 14:42.System: p+p
Energy: 200 GeV
Year: 2012
Library: SL12d
Production tag: P12id
Data stream: st_physics
Triggers: MB(370011)
Run range: 13039132 - 13072020
Number of events: 500k per Trigger
Particles: 5/event
Vertex: no vertex cut
Rapidity: |y|<1.2 flat
pt: 0-16 GeV/c flat
Request ID | 20151202 |
Priority: EC | 0 |
Priority: pwg | Normal |
Status | Larger (or full) sample done, producing PWG QA [6/7] |
Physics Working Group | Heavy Flavor |
Requested by | yezhenyu |
Contact email(s) | yezhenyu2003@gmail.com, bingchu@uic.edu |
Contact phone(s) | |
PWG email(s) | heavy-hn@www.star.bnl.gov |
Assigned Deputy: | Not assigned |
Assigned Helper: | Not assigned |
File lookup | |
Particle | J/psi |
Particle settings | Flat in Pt |
Particles per event | 5 |
Vertex Z, cm | -999 < Vertex < 999 |
Gaussian sigma in X,Y,Z (cm), if applicable | 0, 0, 0 |
Vertex offset: x, mm | 0 |
Vertex offset: y, mm | 0 |
Φ (phi), radian | 0 < Φ < 6.29 |
η (eta) | -1.2 < η < 1.2 |
Pt, GeV | 0 < Pt < 16 |
Trigger Board Meeting for Run15
Updated on Thu, 2015-03-26 12:02. Originally created by jhlee on 2015-03-26 12:02. 2015-03-30 12:30
2015-03-30 14:00
America/New York
Monday, 30 March 2015
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 16:30 (GMT), duration : 01:30
BNL Physics 1-224 and SeeVogh (ID 100 9853), at 16:30 (GMT), duration : 01:30
Time | Talk | Presenter |
---|---|---|
12:30 | Spin and mid-rapidity calorimeter triggers for pAu ( 00:20 ) 1 file | Carl Gagliardi |
12:50 | UPC triggers for pA ( 00:20 ) 0 files | Igor Alekseev |
13:10 | pA high multiplicity trigger ( 00:20 ) 1 file | Frank Geurts |
Status of 2012 IFF analysis
Updated on Thu, 2015-03-26 11:27. Originally created by klandry on 2015-03-26 10:48.
Run-12 W+/W- Cross Section Ratios (Prelim Request)
Updated on Thu, 2015-03-26 10:45. Originally created by posik on 2015-03-26 10:45.HF PWG Meeting Minutes by Zhenyu - 2015/03/26
Updated on Thu, 2015-03-26 11:46. Originally created by yezhenyu on 2015-03-26 10:18.1) Run14 Au+Au picoDst production - Round table discussion
60-70 M events, 20M events per day, 1TB per day for picoDst,
Triggers for Run 15 p+Au
Updated on Sun, 2015-03-29 20:19. Originally created by gagliard on 2015-03-26 10:14.Drell-Yan QCD Bkg Suppression
Updated on Thu, 2015-03-26 10:07. Originally created by sheppel on 2015-03-26 10:07.Run-12 W+/W- Cross Section Ratios
Updated on Thu, 2015-03-26 08:59. Originally created by posik on 2015-03-26 08:59.STAR Management Meeting
Updated on Thu, 2015-04-09 15:36. Originally created by xzb on 2015-03-26 07:53. 2015-04-10 12:00
2015-04-10 13:30
America/New York
Friday, 10 April 2015
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
1) run14 production
D0 signal for PR
https://drupal.star.bnl.gov/STAR/blog/mstftsm/d0-signal-pr-run14-auau-200-gev-official-production
2) run15 status
completion of trans, start long.
p+Au program
3) BUR 16--17
4) NSAC resolution meeting (Berndt's talk)
5) Collaboration meeting
6) shifts
D0 signal for PR
https://drupal.star.bnl.gov/STAR/blog/mstftsm/d0-signal-pr-run14-auau-200-gev-official-production
2) run15 status
completion of trans, start long.
p+Au program
3) BUR 16--17
4) NSAC resolution meeting (Berndt's talk)
5) Collaboration meeting
6) shifts
STAR Management Meeting
Updated on Fri, 2015-04-03 09:43. Originally created by xzb on 2015-03-26 07:53. 2015-04-03 12:00
2015-04-03 13:30
America/New York
Friday, 3 April 2015
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
Meeting ID: 260125137, BNL room 1-189, at 16:00 (GMT), duration : 01:30
1) production status and next priority
D0 peak to be shown at April 11 APS meeting by Howard
from the official production.
2) run status and switch to long. pp run
3) iTPC project (3.2M$ as an MIE project, need to revise the proposal)
4) BUR and charges
collection of projection request to CAD
5) Collaboration meeting program and logistics
6) He3+Au results (PHENIX)