StvKNN Status / Plans

Speaker : Victor


Talk time : 15:05, Duration : 00:15

S&C Offline Software

2015-07-02 15:00
2015-07-02 16:00
America/New York
Thursday, 2 July 2015
1-165, SRN, at 19:00 (GMT), duration : 01:00
SRN 

ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112
TimeTalkPresenter
15:00Recap ( 00:05 ) 0 filesJason
15:05StvKNN Status / Plans ( 00:15 ) 0 filesVictor
15:20Sti, Stv, StvKNN timing ( 00:10 ) 0 filesDmitri
15:30SST Simulator Status ( 00:15 ) 1 fileJonathan
15:45Sti Base QA Update ( 00:10 ) 0 filesJason
16:00AOB ( 00:20 ) 0 filesAll

The TPC Ion Feed Back estimations with garfield++

This note is continuation of https://drupal.star.bnl.gov/STAR/blog/fisyak/grid-leak-between-inner-and-outer-tpc-sectors-estimations-based-garfield.

analysis update report

 start from 07/01/2015

Request of milestones from Software coordinators from 2015-07

updates

Speaker : joanthan


Talk time : 11:20, Duration : 00:20

 - update for SST codes & tables [real data] : https://drupal.star.bnl.gov/STAR/system/files/ssdmeeting_

Re-evaluating efficiencies

Speaker : (Mike)


Talk time : 11:00, Duration : 00:20

 

DIS Proceedings

The submitted version can be found here.

Jet Meeting Collins Update: Embedding and New Asymmetries

 

DNP abstarct

 attached is an abstarct for the fall DNP meeting in October 2015

Talk at SQM2015

 

Zhongbo Kang's prediction for evolution

HFT Analysis and HFT+ Topical Meeting

2015-08-20 08:00
2015-08-22 18:00
America/Los Angeles
-
from Thursday, 20 August 2015 to Saturday, 22 August 2015
Lawrence Berkeley National Laboratory, Meeting Room: 2-100B
Conference organizing committee information :  
Conference duration: 3 days

 This is a STAR topical meeting to discuss the HFT anlaysis status in preparation for the upcoming Quark Matter conference as well as the HFT+ proposal.

BlueJeans room info:

new AnaTree analysis

 07012015:
TEST results is obtained:
1. no trigger electron requirement
2. require at least one tpctof electron another electron can be tpctof or tpcemc electron.

Abstract - Mazurian Lakes Conference

 

newBHT eID QAs

 note the new analysis tree were produce by Bingchu, the dsmAdc problem was fixed during the picoDst process from Mudst while following EMC's method. 

FPS Visual display

First 5 fmsPoints within pion mass cut for events in st_fms_16077027_raw_1500014.MuDst.root for FPS and FMS

Run9 Dijet Comparison New simulation

 

newPicoQA of BHT

they are produced during the Mudst--->PicoDst->>anTree.   it was produced by Bingchu with my picoQA code.

Inclusive Contributions

1) The original writup: