HF-PWG minutes 2016/06/09

1) D0 v2 from 2PC using P16id data: good consistent with previsous preliminary results, as well as the EP method. 

Run 16 EMC dAu 39 GeV Timing Scans

Off-line analysis from cal_scan run # 17161009

BTOW phase 120ns (was 119)
ETOW phase  consistent with 103ns  (was 102, analysis gives ~102.5)

Hot Quarks 2016

 

nsigmae distribution from run14 AuAu 200 GeV

 

Cell Cleaning Prototype

Note on edits: first Version had chi2 fit on less damaged cell also fit to empty bins, causing huge values

LED layout 10 KW design

 

StiCA Integration Status

Speaker : All


Talk time : 16:20, Duration : 00:20

Vertex Fitting

Speaker : Dmitri


Talk time : 16:00, Duration : 00:20

S&C Offline Software

2016-06-09 16:00
2016-06-09 17:00
America/New York
Thursday, 9 June 2016
1-165, SRN, at 20:00 (GMT), duration : 01:00
SRN ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112
TimeTalkPresenter
16:00Vertex Fitting ( 00:20 ) 0 filesDmitri
16:20StiCA Integration Status ( 00:20 ) 0 filesAll

Eval8redo list

 

Grid Leak Dependence on Inner Sector Anode Voltage - GARFIELD Simulations

This study makes use of GARFIELD simulations to look at the dependence of the grid leak on the voltage of the anode wires.

Run12 Inclusive Jet A_LL -- embedding sample -- 4 (QA)

v0.8 tune with exponent 0.213
v1.1 tune with exponent 0.12
pages:
1: jet pt
2: jet eta
3: jet phi
4: jet rt
5: jet paricle jt 

News from the front

Speaker : L. Yi ( Yale )


Talk time : 12:00, Duration : 00:10

 

QA for Run16 Au+Au 200 GeV

AOB

Speaker : All ( All )


Talk time : 12:55, Duration : 00:20
Code sanity progress
  • Good progress from Akio (FMS/FPS - many thanks for the examplary work), TOF still needs to take care of the opened issues and a delay in informing the MTD appeared.

Calibration status

Speaker : G. Van Buren


Talk time : 12:40, Duration : 00:15

Progress with Dubna Grid based production

Speaker : L. Hajdu ( BNL )


Talk time : 12:25, Duration : 00:15

Offline software summary

Software and Computing Meeting

2016-06-08 12:00
2016-06-08 13:00
America/New York
Wednesday, 8 June 2016
1-189, SRN, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00News from the front ( 00:10 ) 1 fileL. Yi (Yale)
12:10Offline software summary ( 00:15 ) 0 filesJ. Webb (BNL)
12:25Progress with Dubna Grid based production ( 00:15 ) 2 filesL. Hajdu (BNL)
12:40Calibration status ( 00:15 ) 0 filesG. Van Buren
12:55AOB ( 00:20 ) 0 filesAll (All)

run16 AuAu200GeV QA for HFT related study