Executive session with the commitee only
Updated on Fri, 2016-04-15 09:12. Originally created by akio on 2016-04-06 11:09.Discussions
Updated on Thu, 2016-04-07 06:50. Originally created by akio on 2016-04-06 11:08.Trigger system/QT boards status and future plan
Updated on Thu, 2016-04-07 13:45 by crawford. Originally created by akio on 2016-04-06 10:52.DEP for EPD
Updated on Wed, 2016-04-06 11:05. Originally created by akio on 2016-04-06 10:50.Lunch Break
Updated on Wed, 2016-04-06 11:31. Originally created by akio on 2016-04-06 10:48.People, Cost, Timeline
Updated on Thu, 2016-04-07 12:28 by aschmah. Originally created by akio on 2016-04-06 10:47.Reference
Speaker : Alexander Schmah
Talk time : 11:50, Duration : 00:25
Final Design
Updated on Wed, 2016-04-06 11:13. Originally created by akio on 2016-04-06 10:46.Reference
Speaker : Alexander Schmah
Talk time : 11:25, Duration : 00:25
Results from R&D Phase
Updated on Wed, 2016-04-06 11:13. Originally created by akio on 2016-04-06 10:44.Reference
Speaker : Alexander Schmah
Talk time : 10:35, Duration : 00:25
Requirements and Simulation
Updated on Wed, 2016-04-06 11:12. Originally created by akio on 2016-04-06 10:43.Reference
Speaker : Alexander Schmah
Talk time : 10:10, Duration : 00:25
EPD Physics
Updated on Wed, 2016-04-06 11:11. Originally created by akio on 2016-04-06 10:42.Reference
Speaker : Alexander Schmah
Talk time : 09:45, Duration : 00:25
Run14 vertex resolution
Updated on Wed, 2016-04-06 10:15. Originally created by huangbc on 2016-04-06 10:01.Run14 st_physics data reproduction request and VF parameter test
Updated on Wed, 2016-04-06 09:48. Originally created by dongx on 2016-04-06 09:48.Reference
Speaker : Guannan/Mustafa/Xin
Talk time : 12:00, Duration : 00:20
https://drupal.star.bnl.gov/STAR/blog/dongx/run14-stphysics-data-repr
S&C Offline Software
Updated on Wed, 2016-04-06 09:03. Originally created by jwebb on 2016-04-06 09:03.1-165, SRN, at 20:00 (GMT), duration : 01:00
SRN ID: 1096183 EVO Phone Bridge Telephone Numbers: --------------- - USA (BNL, Upton, NY) +1 631 344 6100 - USA (Caltech, Pasadena, CA) +1 626 395 2112
Time | Talk | Presenter |
---|---|---|
16:00 | StiCA Update ( 00:20 ) 1 file | |
16:20 | Vertex Fitting ( 00:20 ) 1 file | Dmitri |
EPD Data Analysis 2016 Run
Updated on Thu, 2016-04-07 00:28. Originally created by rjreed on 2016-04-06 00:31.psn0636
Updated on Wed, 2016-04-06 00:27. Originally created by chiyang on 2016-04-06 00:20.CVS code is in offline/paper/psn0636/
PWGC Meeting
Updated on Tue, 2016-04-05 09:51. Originally created by geurts on 2016-04-05 09:37.https://bluejeans.com/883580682/9067, at 15:00 (GMT), duration : 01:30
1) Study of Minuit Vertex Finder parameters in Run-14 Au+Au [Xin Dong]
See Xin's blog: https://drupal.star.bnl.gov/STAR/blog/dongx/minuit-vf-parameter-study-run14-auau200-vpdmb-data
2) Test Production QA
updates on status of test analyses taking place in PWGs
see e.g. http://www.star.bnl.gov/HyperNews-star/protected/get/starpwgc/4156/1/1/1.html
3) Review PWG_TASKS leases
https://drupal.star.bnl.gov/STAR/pwg/common/pwg-disk-quota-leases
4) Upcoming deadlines and conferences
https://drupal.star.bnl.gov/STAR/pwg/common/upcoming-conferences-deadlines
SQM abstracts: see https://drupal.star.bnl.gov/STAR/blog/geurts/star-2016-conference-contributions
5) AOB
Click on the following link for the BlueJeans Connection Details for PWGC Meetings
SQM2016
Updated on Mon, 2016-04-04 17:34. Originally created by nasim on 2016-04-04 17:31.Title: Measurement of correlation between different order flow harmonics and event plane angles in heavy-ion collision in STAR.
Trigger Board Meeting for Run16
Updated on Sun, 2016-04-03 12:46. Originally created by jhlee on 2016-04-03 12:46.BNL Physics 1-224 and SeeVogh (ID 101 6255), at 17:00 (GMT), duration : 00:00
STAR BUR writing committee 2016
Updated on Sun, 2016-04-03 10:02. Originally created by xzb on 2016-04-03 09:45.https://bluejeans.com/333205157, at 19:00 (GMT), duration : 01:30
Agenda:
discussion of materials at hands
default table of options:
24 cryo-weeks, 19 cryo-weeks (baseline) and 15 cryo-weeks
likely 2 weeks of CeC R&D for EIC (coherent electron cooling test)
2.5 weeks of cool-down and machine commissioning
from past experience and what CAD provided for switching to d+Au (0.5 weeks per switch)
1) pp510
at least 10--11 weeks of operation
2) isobars (Zr-96 and Ru-96)
Latest news from CAD is that Ru-96 with natural abundance
can achieve about 20% of the Au+Au luminosity, (10^9 ions per bunch)
This means that Au+Au luminosity is about 103x10^26cm^2s-1, x20%*5barns = 10KHz
average store luminosity is about 80% of that.
However, this is more than enough for our purpose.
If DAQ rate is 2000Hz, and we run at 95 hours per week,
this should provides us with 680 million events per week
1.5 weeks of Zr and Ru each with ~1 billion MB events (realistically 800M).
+0.5 weeks each for setup;
4 weeks of Isobar running
3) possible 27GeV running for Lambda/lambdabar polarization
similar calculations, now luminosity goes down by a factor (27/200)^2 = 2%
This is 1800Hz
with a week running, 600million MB events
effectively, at least 1.5 weeks of running
4) RHICf
two programs:
a) cross-section
b) A_N
each about 0.5 week
This is a separate request to PAC, but need to coordinate among RHICf and STAR
Sako is in our committee so that he knows what we are proposing.
Cryo-weeks necessary for operation:
MAXIMUM:
2.5+11+4+1.5+1.5 = 20.5 weeks + 2 (CeC) = 22.5 weeks
MINIMUM:
a)
2.5+10 =12.5+2 = 14.5 weeks (just pp510 program)
b)
2.5+10+1=13.5+2=15.5 weeks (pp510 + RHICf)
c)
2.5+10+1+1.5 = 15+2 = 17 weeks (pp510+RHICf+27)
d)
2.5+10+1+4 = 17.5+2 = 19.5 weeks (pp510+RHICf+Isobar)
???