Run12 Collins Analysis: Investigation of Angles Issue

 

Sector Installation


Talk time : 14:10, Duration : 00:20

 

Strongback production at LBNL


Talk time : 13:50, Duration : 00:20

Grid Leak Input to the iTPC Design

Speaker : Irakli Chakaberia


Talk time : 13:30, Duration : 00:20

 

Logic of trigger bias calculation for D_TT analysis

 In the estimation of the systematic uncertainty contributed by the trigger bias, the information from the MC sample and model calculation are used.

Production Priorities Fall 2017

Production Priorities - Fall 2017

Proposed production priorities

Weekly Meeting (Sep. 18)

- Chong: RUN15 FMS-FPS alignment update
- zhanwen: energy scale problem

UPC J/Psi production in 2016 AuAu

Speaker : W. Schmidke


Talk time : 10:30, Duration : 00:20

iTPC review rehearsals

2017-09-19
America/New York
Tuesday, 19 September 2017
1-189, at 13:30 (GMT), duration : 00:00
 eZuse information
Title: iTPC rehearsals
Description:
Community: STAR
Meeting type: Open Meeting (Round Table)

Meeting Access Information:
SeeVoghRN Application       http://srn.ezuce.com/joinSRN?meeting=MtM8Ma2u2MDnD29i9eDs9t
Mobile App :  Meeting ID: 776 0749   or  Link: http://srn.ezuce.com/join?meeting=MtM8Ma2u2MDnD29i9eDs9t


- Phone Bridge
 ID: 776 0749

Eastern Daylight Time (-0400)
Start 2017-09-19  08:00
End   2017-09-19  17:00


Rehearsal of review talks for September 26.

September 26, 2017

8:00 am          Closed Executive Session

8:30                Overview [NP1] (Flemming Videbaek) 30+15

§  What is the project

§  Progress since last review – highlights

§  Production Schedule (high level)

§  Follow-up on previous reviews

§  Issues and concerns

9:15                Mechanical (Jim Thomas)

§  pad planes, pad plane joining; shipping 15+15

9:45                MWPC (Qinghua Xu) 30+15

§  production, status, schedule, workforce

10:30              Break

10:45              Electronics [NP2] (Tonko Ljubicic) 30+15

§  development,

§  Results from chain tests

11:30              Installation tools and experience (Rahul) 20+10

 

12:00 pm       Working Lunch/Closed Executive Session

 

1:00                Testing and QA at SDU (Chi Yang) 20+10

1:30                Gridleak design , calculation, implementation (Irakli Chakaberia) 20+10

§  design considerations

§  Final calculations,

2:00                ES&H (Robert Pak) 15+10

§  General approach

§  Review reviews, and responses

2:25                Cost and schedule [NP3] (Flemming) 30+10

§  Current cost status and projections

§  Production schedule, key mile stones

§  Installation (assumptions, workforce)

§  Testing, commissioning (workforce, schedule)

3:05                Break


 [NP1]Panel needs to hear about 2016 recommendation 1, revised KPPs, and 2, Lessons Learned

 [NP2]Panel needs to hear about 2016 recommendation 1, revised KPPs, and 2, Lessons Learned

 [NP3]Panel needs to hear about recommendation 5 workforce, 6 commissioning plan, and 7 updated schedule plans as integrated with running plans.

TimeTalkPresenter
13:30Grid Leak Input to the iTPC Design ( 00:20 ) 2 filesIrakli Chakaberia
13:50Strongback production at LBNL ( 00:20 ) 1 file
14:10Sector Installation ( 00:20 ) 1 file

dN/dx, status and plans

 

Run 17 TPC IFCE shorted ring

I previously estimated the location of the IFCE short in Run 17 (first appeared on 2017-04-13) via laser data t

Talk at 3rd Resonance Workshop Bergamo

 25 mins talk

Abstract for APS FarWest

 

Abstract for APS FarWest

 

Sti Optimization

Speaker : Dmitri, Victor


Talk time : 16:40, Duration : 00:20

HFT Embedding / Misalignment

Speaker : Jason, Yi, Xin


Talk time : 16:15, Duration : 00:25

  • Misalignment Tests and SST Slow Simu [Yi]

Forward Tracking Updates

Speaker : Victor, Guannan


Talk time : 16:00, Duration : 00:15
  • Update on Stv Forward [Victor]
  • Update on Si Disk Studies [Guannan]

S&C Offline Software

2017-09-14 16:00
2017-09-14 17:00
America/New York
Thursday, 14 September 2017
1-189, SRN, at 20:00 (GMT), duration : 01:00
SRN ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112
TimeTalkPresenter
16:00Forward Tracking Updates ( 00:15 ) 0 filesVictor, Guannan
16:15HFT Embedding / Misalignment ( 00:25 ) 0 filesJason, Yi, Xin
16:40Sti Optimization ( 00:20 ) 0 filesDmitri, Victor

Weekly Meeting (Sep. 14)

- Chong: addendum (updated) to the last week's report

Jet pt distributions sctor wise p+Au 2015 : day 152