Weekly meeting (Aug. 21)

- David Kapukchyan: Here is my update on the IV curves.  Attached is also the paper I am using for my study.
- Chong: update on FMS-FPS alignment

HFT VMC Embedding status and plans.

 1. HFT Simulators:
     Pxl fast simulation with status tables,
     Ist slow simulation,
     Sst fast.

EPD Cosmic Test 4

For set-up, and early thought processes, see:
drupal.star.bnl.gov/STAR/blog/rjreed/epd-cosmic-test-2

2012 _ Simulation _ More Plots

Code QA for GPC #239

  1. First look, Aug.10 (My working directory is : /star/data01/pwg/tnonaka/GPC/AuAuFixedTarget4_5GeV)

EPD Cosmic Test 3

The cosmic test stand set-up for this analysis can be seen at:

Primary Vertex Error in 2016 data

Yuri noted in the AuAu data, in the primary vertex error vs. number of tracks distributions there is a second band sitting at higher values.

EPD RX board assembly

 

The primary vertex errors for events with HFT reconstructed by VFMinuit

 

Management Meeting

2017-08-18 10:00
2017-08-18 11:00
America/New York
Friday, 18 August 2017
Meeting starts 10am BNL Time - BlueJeans Conference ID : 160455989, at 14:00 (GMT), duration : 01:00
 agenda: 

1) summer shut-down 
staropsman-l at lists.bnl.gov 

2) council discussion on PAC recommendation 

3) convenorship 

4) upgrades 

5) production? 

6) newsletter August/ Analysis meeting/collaboration meeting

Management Meeting

2017-08-25 10:00
America/New York
Friday, 25 August 2017
, at 14:00 (GMT), duration : 00:00
 BlueJeans Conference ID : 160455989, at 14:00 (GMT), duration : 01:00


 agenda: 

1) summer shut-down 

2) upgrades

3)  PAC "blind analysis" recommendation 

4) convenorships

5) production

6) Fuqiang's Email...

7) newsletter August

8) Analysis meeting at BNL?

9) DoE "site" visit - update of STAR stats

 

10) AOB
 

Management Meeting

2017-09-01 10:00
America/New York
Friday, 1 September 2017
, at 14:00 (GMT), duration : 00:00

Management Meeting

2017-08-11 10:00
America/New York
Friday, 11 August 2017
, at 14:00 (GMT), duration : 00:00
 
Meeting starts 10am BNL Time - BlueJeans Conference ID : 160455989

Agenda


1) convenorship (Bulk, HF)
2) RHIC retreat, run 18 preparation
3) shut-down schedule and status 
4) newsletter 
5) PAC recommendations
6) CME plan? 
7) RHICf presentation material and procedure

draft talk for fudan meeting

 Draft for talk at fudan QCS and BES-II meeting next week
It has large overlap with the talk I gave at SQM

EPD Cosmic Test 2

EPD Cosmic test stand for this test is shown at:

AOB


Talk time : 17:00, Duration : 00:20
  • STAR NOTE on Track Finding
    • Rough draft / detailed outline circulated to Jerome, Gene, Victor, Dmitri... you all have write access

Stv RK Status


Talk time : 16:40, Duration : 00:20

HFT Embedding / Misalignment


Talk time : 16:00, Duration : 00:20
Efficiency Studies [Yi]

Optmization / Sti G3/BTOF Dependence


Talk time : 16:20, Duration : 00:20

Event filler currently uses the G3 geometry (converted to old ROOT TVolume, TNode classes) in propagation of tracks to BTOF for track-matching used by the vertex finder...

S&C Offline Software

2017-08-10 16:00
America/New York
Thursday, 10 August 2017
1-189, SRN, at 20:00 (GMT), duration : 00:00
SRN ID: 1096183

EVO Phone Bridge Telephone Numbers:
---------------
- USA (BNL, Upton, NY)
+1 631 344 6100

- USA (Caltech, Pasadena, CA)
+1 626 395 2112
TimeTalkPresenter
16:00HFT Embedding / Misalignment ( 00:20 ) 0 files
16:20Optmization / Sti G3/BTOF Dependence ( 00:20 ) 0 files
16:40Stv RK Status ( 00:20 ) 0 files
17:00AOB ( 00:20 ) 0 files