Weekly meeting (Aug. 21)
- David Kapukchyan: Here is my update on the IV curves. Attached is also the paper I am using for my study.
- Chong: update on FMS-FPS alignment
HFT VMC Embedding status and plans.
Updated on Mon, 2017-08-14 10:59. Originally created by fisyak on 2017-08-14 10:56. 1. HFT Simulators:
Pxl fast simulation with status tables,
Ist slow simulation,
Sst fast.
EPD Cosmic Test 4
Updated on Sun, 2017-08-13 23:19. Originally created by rjreed on 2017-08-13 22:57.
For set-up, and early thought processes, see:
drupal.star.bnl.gov/STAR/blog/rjreed/epd-cosmic-test-2
2012 _ Simulation _ More Plots
Updated on Thu, 2017-10-26 00:09. Originally created by sra233 on 2017-08-13 20:51.Code QA for GPC #239
Updated on Tue, 2017-08-15 22:36. Originally created by tnonaka on 2017-08-13 20:30.- First look, Aug.10 (My working directory is : /star/data01/pwg/tnonaka/GPC/AuAuFixedTarget4_5GeV)
EPD Cosmic Test 3
Updated on Sat, 2017-08-12 16:22. Originally created by rjreed on 2017-08-12 13:39.The cosmic test stand set-up for this analysis can be seen at:
Primary Vertex Error in 2016 data
Updated on Fri, 2017-08-11 18:20. Originally created by dongx on 2017-08-11 18:18.Yuri noted in the AuAu data, in the primary vertex error vs. number of tracks distributions there is a second band sitting at higher values.
EPD RX board assembly
Updated on Fri, 2017-08-11 11:02. Originally created by timcam on 2017-08-11 11:02.
The primary vertex errors for events with HFT reconstructed by VFMinuit
Updated on Fri, 2017-08-11 10:25. Originally created by fisyak on 2017-08-11 10:25.
Management Meeting
Updated on Thu, 2017-08-17 20:40 by xzb. Originally created by caines on 2017-08-10 20:28.Meeting starts 10am BNL Time - BlueJeans Conference ID : 160455989, at 14:00 (GMT), duration : 01:00
1) summer shut-down
staropsman-l at lists.bnl.gov
2) council discussion on PAC recommendation
3) convenorship
4) upgrades
5) production?
6) newsletter August/ Analysis meeting/collaboration meeting
Management Meeting
Updated on Fri, 2017-08-25 06:35. Originally created by caines on 2017-08-10 20:28., at 14:00 (GMT), duration : 00:00
agenda:
1) summer shut-down
2) upgrades
3) PAC "blind analysis" recommendation
4) convenorships
5) production
6) Fuqiang's Email...
7) newsletter August
8) Analysis meeting at BNL?
9) DoE "site" visit - update of STAR stats
10) AOB
Management Meeting
Updated on Thu, 2017-08-10 20:28 by xzb. Originally created by caines on 2017-08-10 20:28., at 14:00 (GMT), duration : 00:00
Management Meeting
Updated on Thu, 2017-08-10 20:34 by xzb. Originally created by caines on 2017-08-10 20:27., at 14:00 (GMT), duration : 00:00
Meeting starts 10am BNL Time - BlueJeans Conference ID : 160455989
Agenda
1) convenorship (Bulk, HF)
2) RHIC retreat, run 18 preparation
3) shut-down schedule and status
4) newsletter
5) PAC recommendations
6) CME plan?
7) RHICf presentation material and procedure
draft talk for fudan meeting
Updated on Thu, 2017-08-10 19:28. Originally created by videbaks on 2017-08-10 19:25. Draft for talk at fudan QCS and BES-II meeting next week
It has large overlap with the talk I gave at SQM
EPD Cosmic Test 2
Updated on Sat, 2017-08-12 13:29. Originally created by rjreed on 2017-08-10 17:19.EPD Cosmic test stand for this test is shown at:
AOB
Updated on Thu, 2017-08-10 13:36. Originally created by jwebb on 2017-08-10 13:36.Reference
Talk time : 17:00, Duration : 00:20
- STAR NOTE on Track Finding
- Rough draft / detailed outline circulated to Jerome, Gene, Victor, Dmitri... you all have write access
Stv RK Status
Updated on Thu, 2017-08-10 13:33. Originally created by jwebb on 2017-08-10 13:33.Reference
Talk time : 16:40, Duration : 00:20
HFT Embedding / Misalignment
Updated on Thu, 2017-08-10 14:56. Originally created by jwebb on 2017-08-10 13:33.Optmization / Sti G3/BTOF Dependence
Updated on Thu, 2017-08-10 14:56. Originally created by jwebb on 2017-08-10 13:27.Reference
Talk time : 16:20, Duration : 00:20
Event filler currently uses the G3 geometry (converted to old ROOT TVolume, TNode classes) in propagation of tracks to BTOF for track-matching used by the vertex finder...
S&C Offline Software
Updated on Thu, 2017-08-10 13:27. Originally created by jwebb on 2017-08-10 13:27.1-189, SRN, at 20:00 (GMT), duration : 00:00
SRN ID: 1096183 EVO Phone Bridge Telephone Numbers: --------------- - USA (BNL, Upton, NY) +1 631 344 6100 - USA (Caltech, Pasadena, CA) +1 626 395 2112
Time | Talk | Presenter |
---|---|---|
16:00 | HFT Embedding / Misalignment ( 00:20 ) 0 files | |
16:20 | Optmization / Sti G3/BTOF Dependence ( 00:20 ) 0 files | |
16:40 | Stv RK Status ( 00:20 ) 0 files | |
17:00 | AOB ( 00:20 ) 0 files |