iTPC DOE review, Sep.26-27 2017
Updated on Fri, 2017-09-22 09:44. Originally created by chiyang on 2017-09-22 09:44.
12th high-pt workshop @ Bergen
Updated on Sat, 2018-01-27 00:09. Originally created by yiyang on 2017-09-21 19:52.12th high-pt workshop @ Bergen
tof pid Efficiency of softpion
Updated on Thu, 2017-09-21 10:12. Originally created by jiyj on 2017-09-21 09:36.
Eta Dependence of Radiation Damage / Effect on Corrections
Updated on Thu, 2017-09-21 02:46. Originally created by bsumma on 2017-09-21 02:46.
High pT workshop 2017
Updated on Mon, 2017-10-02 01:01. Originally created by yili on 2017-09-20 14:32.
Run12 Collins Analysis: Investigation of Angles Issue
Updated on Wed, 2017-09-20 14:33. Originally created by jkadkins on 2017-09-19 17:19.
Sector Installation
Updated on Tue, 2017-09-19 10:34. Originally created by rsharma on 2017-09-19 10:34.Strongback production at LBNL
Updated on Tue, 2017-09-19 09:32. Originally created by jhthomas on 2017-09-19 09:32.Reference
Talk time : 13:50, Duration : 00:20
Grid Leak Input to the iTPC Design
Updated on Sat, 2017-09-23 12:21. Originally created by iraklic on 2017-09-19 08:36.Reference
Speaker : Irakli Chakaberia
Talk time : 13:30, Duration : 00:20
Logic of trigger bias calculation for D_TT analysis
Updated on Tue, 2017-09-19 21:49. Originally created by jcmei on 2017-09-19 05:22.In the estimation of the systematic uncertainty contributed by the trigger bias, the information from the MC sample and model calculation are used.
Weekly Meeting (Sep. 18)
- Chong: RUN15 FMS-FPS alignment update
- zhanwen: energy scale problem
UPC J/Psi production in 2016 AuAu
Updated on Mon, 2017-09-18 09:18. Originally created by wschmidk on 2017-09-18 09:18.iTPC review rehearsals
1-189, at 13:30 (GMT), duration : 00:00
Title: iTPC rehearsals
Description:
Community: STAR
Meeting type: Open Meeting (Round Table)
Meeting Access Information:
SeeVoghRN Application http://srn.ezuce.com/joinSRN?meeting=MtM8Ma2u2MDnD29i9eDs9t
Mobile App : Meeting ID: 776 0749 or Link: http://srn.ezuce.com/join?meeting=MtM8Ma2u2MDnD29i9eDs9t
- Phone Bridge
ID: 776 0749
Eastern Daylight Time (-0400)
Start 2017-09-19 08:00
End 2017-09-19 17:00
Rehearsal of review talks for September 26.
September 26, 2017
8:00 am Closed Executive Session
8:30 Overview [NP1] (Flemming Videbaek) 30+15
§ What is the project
§ Progress since last review – highlights
§ Production Schedule (high level)
§ Follow-up on previous reviews
§ Issues and concerns
9:15 Mechanical (Jim Thomas)
§ pad planes, pad plane joining; shipping 15+15
9:45 MWPC (Qinghua Xu) 30+15
§ production, status, schedule, workforce
10:30 Break
10:45 Electronics [NP2] (Tonko Ljubicic) 30+15
§ development,
§ Results from chain tests
11:30 Installation tools and experience (Rahul) 20+10
12:00 pm Working Lunch/Closed Executive Session
1:00 Testing and QA at SDU (Chi Yang) 20+10
1:30 Gridleak design , calculation, implementation (Irakli Chakaberia) 20+10
§ design considerations
§ Final calculations,
2:00 ES&H (Robert Pak) 15+10
§ General approach
§ Review reviews, and responses
2:25 Cost and schedule [NP3] (Flemming) 30+10
§ Current cost status and projections
§ Production schedule, key mile stones
§ Installation (assumptions, workforce)
§ Testing, commissioning (workforce, schedule)
3:05 Break
[NP1]Panel needs to hear about 2016 recommendation 1, revised KPPs, and 2, Lessons Learned
[NP2]Panel needs to hear about 2016 recommendation 1, revised KPPs, and 2, Lessons Learned
[NP3]Panel needs to hear about recommendation 5 workforce, 6 commissioning plan, and 7 updated schedule plans as integrated with running plans.
Time | Talk | Presenter |
---|---|---|
13:30 | Grid Leak Input to the iTPC Design ( 00:20 ) 2 files | Irakli Chakaberia |
13:50 | Strongback production at LBNL ( 00:20 ) 1 file | |
14:10 | Sector Installation ( 00:20 ) 1 file |
dN/dx, status and plans
Updated on Fri, 2017-09-15 17:38. Originally created by fisyak on 2017-09-15 17:38.
Run 17 TPC IFCE shorted ring
Updated on Sat, 2017-09-23 23:28. Originally created by genevb on 2017-09-15 16:15.Talk at 3rd Resonance Workshop Bergamo
Updated on Wed, 2017-10-11 08:58. Originally created by subhash on 2017-09-15 13:50.25 mins talk
Abstract for APS FarWest
Updated on Fri, 2017-09-15 12:45. Originally created by sheppel on 2017-09-15 12:45.
Abstract for APS FarWest
Updated on Fri, 2017-09-15 12:45. Originally created by sheppel on 2017-09-15 12:45.
Sti Optimization
Updated on Thu, 2017-09-14 14:48. Originally created by jwebb on 2017-09-14 14:32.Reference
Speaker : Dmitri, Victor
Talk time : 16:40, Duration : 00:20
HFT Embedding / Misalignment
Updated on Thu, 2017-09-14 14:47. Originally created by jwebb on 2017-09-14 14:03.Reference
Speaker : Jason, Yi, Xin
Talk time : 16:15, Duration : 00:25
- Misalignment Tests and SST Slow Simu [Yi]