iTPC DOE review, Sep.26-27 2017

 

12th high-pt workshop @ Bergen

 12th high-pt workshop @ Bergen

tof pid Efficiency of softpion

 

Eta Dependence of Radiation Damage / Effect on Corrections

 

High pT workshop 2017

 

Run12 Collins Analysis: Investigation of Angles Issue

 

Sector Installation


Talk time : 14:10, Duration : 00:20

 

Strongback production at LBNL


Talk time : 13:50, Duration : 00:20

Grid Leak Input to the iTPC Design

Speaker : Irakli Chakaberia


Talk time : 13:30, Duration : 00:20

 

Logic of trigger bias calculation for D_TT analysis

 In the estimation of the systematic uncertainty contributed by the trigger bias, the information from the MC sample and model calculation are used.

Weekly Meeting (Sep. 18)

- Chong: RUN15 FMS-FPS alignment update
- zhanwen: energy scale problem

UPC J/Psi production in 2016 AuAu

Speaker : W. Schmidke


Talk time : 10:30, Duration : 00:20

iTPC review rehearsals

2017-09-19
America/New York
Tuesday, 19 September 2017
1-189, at 13:30 (GMT), duration : 00:00
 eZuse information
Title: iTPC rehearsals
Description:
Community: STAR
Meeting type: Open Meeting (Round Table)

Meeting Access Information:
SeeVoghRN Application       http://srn.ezuce.com/joinSRN?meeting=MtM8Ma2u2MDnD29i9eDs9t
Mobile App :  Meeting ID: 776 0749   or  Link: http://srn.ezuce.com/join?meeting=MtM8Ma2u2MDnD29i9eDs9t


- Phone Bridge
 ID: 776 0749

Eastern Daylight Time (-0400)
Start 2017-09-19  08:00
End   2017-09-19  17:00


Rehearsal of review talks for September 26.

September 26, 2017

8:00 am          Closed Executive Session

8:30                Overview [NP1] (Flemming Videbaek) 30+15

§  What is the project

§  Progress since last review – highlights

§  Production Schedule (high level)

§  Follow-up on previous reviews

§  Issues and concerns

9:15                Mechanical (Jim Thomas)

§  pad planes, pad plane joining; shipping 15+15

9:45                MWPC (Qinghua Xu) 30+15

§  production, status, schedule, workforce

10:30              Break

10:45              Electronics [NP2] (Tonko Ljubicic) 30+15

§  development,

§  Results from chain tests

11:30              Installation tools and experience (Rahul) 20+10

 

12:00 pm       Working Lunch/Closed Executive Session

 

1:00                Testing and QA at SDU (Chi Yang) 20+10

1:30                Gridleak design , calculation, implementation (Irakli Chakaberia) 20+10

§  design considerations

§  Final calculations,

2:00                ES&H (Robert Pak) 15+10

§  General approach

§  Review reviews, and responses

2:25                Cost and schedule [NP3] (Flemming) 30+10

§  Current cost status and projections

§  Production schedule, key mile stones

§  Installation (assumptions, workforce)

§  Testing, commissioning (workforce, schedule)

3:05                Break


 [NP1]Panel needs to hear about 2016 recommendation 1, revised KPPs, and 2, Lessons Learned

 [NP2]Panel needs to hear about 2016 recommendation 1, revised KPPs, and 2, Lessons Learned

 [NP3]Panel needs to hear about recommendation 5 workforce, 6 commissioning plan, and 7 updated schedule plans as integrated with running plans.

TimeTalkPresenter
13:30Grid Leak Input to the iTPC Design ( 00:20 ) 2 filesIrakli Chakaberia
13:50Strongback production at LBNL ( 00:20 ) 1 file
14:10Sector Installation ( 00:20 ) 1 file

dN/dx, status and plans

 

Run 17 TPC IFCE shorted ring

I previously estimated the location of the IFCE short in Run 17 (first appeared on 2017-04-13) via laser data t

Talk at 3rd Resonance Workshop Bergamo

 25 mins talk

Abstract for APS FarWest

 

Abstract for APS FarWest

 

Sti Optimization

Speaker : Dmitri, Victor


Talk time : 16:40, Duration : 00:20

HFT Embedding / Misalignment

Speaker : Jason, Yi, Xin


Talk time : 16:15, Duration : 00:25

  • Misalignment Tests and SST Slow Simu [Yi]