Two Pion Plot: Signal vs Background
Updated on Thu, 2018-03-08 11:19. Originally created by wsolyst on 2018-02-15 14:24.
AOB
Updated on Thu, 2018-02-15 13:54. Originally created by jwebb on 2018-02-15 13:54.Reference
Talk time : 17:00, Duration : 00:01
iTPC Integration DIscussion
Updated on Thu, 2018-02-15 13:53. Originally created by jwebb on 2018-02-15 13:53.Reference
Talk time : 16:30, Duration : 00:30
HFT Embedding Discussion
Updated on Thu, 2018-02-15 15:59 by rksooraj. Originally created by jwebb on 2018-02-15 13:52.Reference
Talk time : 16:00, Duration : 00:30
1) Data QA (Sooraj)
https://drupal.star.bnl.gov/STAR/system/files/QAEmbedding_test7_d.pdf
S&C Offline Software
Updated on Thu, 2018-02-15 13:37. Originally created by jwebb on 2018-02-15 13:37. 2018-02-15 16:00
2018-02-15 17:00
America/New York
Thursday, 15 February 2018
1-189, SRN, at 21:00 (GMT), duration : 01:00
1-189, SRN, at 21:00 (GMT), duration : 01:00
SRN ID: 1096183 EVO Phone Bridge Telephone Numbers: --------------- - USA (BNL, Upton, NY) +1 631 344 6100 - USA (Caltech, Pasadena, CA) +1 626 395 2112
Time | Talk | Presenter |
---|---|---|
16:00 | HFT Embedding Discussion ( 00:30 ) 0 files | |
16:30 | iTPC Integration DIscussion ( 00:30 ) 0 files | |
17:00 | AOB ( 00:01 ) 0 files |
BEMC Software Coordinator Tasks
Updated on Thu, 2018-02-15 12:19. Originally created by jlzhang on 2018-02-15 12:10.1. Preparation for the run
Trigger Efficiency simulation and the top down asymmetry
Updated on Thu, 2018-02-15 11:46. Originally created by bsumma on 2018-02-15 11:46.Here I present a look at trigger efficiency differences for one calibration in pp and pA, and it's possible contribution to the top-bottom FMS asymmetry
U->ee reconstruction efficiency
Updated on Thu, 2018-02-15 09:58. Originally created by matonoli on 2018-02-15 09:58.
Simulation request status (FMS-2011)
Updated on Thu, 2018-05-03 08:35. Originally created by mriganka on 2018-02-15 09:01.ALL for Dijets in Run 13 (Preliminary Result)
Updated on Mon, 2019-06-17 17:21. Originally created by aquinter on 2018-02-15 08:08.HFT embedding evaluation
Updated on Wed, 2018-02-14 11:44 by jwebb. Originally created by jeromel on 2018-02-14 11:13.Speaker : TBA ( BNL )
Talk time : 12:40, Duration : 00:20
iTPC integration status
Updated on Wed, 2018-02-14 13:58 by jwebb. Originally created by jeromel on 2018-02-14 11:12.Speaker : TBA ( BNL )
Talk time : 12:20, Duration : 00:20
https://docs.google.com/presentation/d/1UMr4-b9rigbVaEYQU3u_icowpKNtd7XZ_5mFM31DcSA/edit?
Embedding library updates
Updated on Fri, 2018-02-16 11:58 by genevb. Originally created by jeromel on 2018-02-14 11:11.Speaker : Gene Van Buren ( BNL )
Talk time : 12:00, Duration : 00:20
Software and Computing Meeting
Updated on Wed, 2018-02-14 11:10 by testadmin. Originally created by jeromel on 2018-02-14 11:10. 2018-02-14 12:00
2018-02-14 12:00
America/New York
Wednesday, 14 February 2018
1-189, SRN, at 17:00 (GMT), duration : 00:00
1-189, SRN, at 17:00 (GMT), duration : 00:00
Time | Talk | Presenter |
---|---|---|
12:00 | Embedding library updates ( 00:20 ) 1 file | Gene Van Buren (BNL) |
12:20 | iTPC integration status ( 00:20 ) 1 file | TBA (BNL) |
12:40 | HFT embedding evaluation ( 00:20 ) 0 files | TBA (BNL) |
vped confusion - 2018
Updated on Wed, 2018-02-14 15:58. Originally created by rjreed on 2018-02-14 00:46.We want to find a way to check the mapping of the epd from the FEEs through the QT. The idea is that if we change the vped setting in a given channel, we should see the pedestal shift. The
North-East EPD
Updated on Tue, 2018-02-13 17:47. Originally created by adams92 on 2018-02-13 17:40.Attached is a picture of the North side of the East EPD. It is to demonstrate the curvature in the fiber bundle attached to the Supersector in PP09.
Presentation to CME focus group
Updated on Tue, 2018-02-13 12:26. Originally created by lisa on 2018-02-13 12:26. Below find my slides, to be shown on 13 feb 2018
comparison with standard method
Updated on Tue, 2018-02-13 09:50. Originally created by kocmic on 2018-02-13 09:34.