Digging for production changes after SL16d
Updated on Fri, 2018-09-21 09:14. Originally created by genevb on 2018-09-20 17:01. Following up on the problematic JetCorr PWG findings...
Calibration status
Updated on Thu, 2018-09-20 15:55. Originally created by ckimstar on 2018-09-20 15:55.Checking if the EPD is hanging safely
Updated on Thu, 2018-09-20 13:29. Originally created by lisa on 2018-09-20 13:28. On 22 June 2018, we took down the EPD and hung it like 20 feet high on the East wall of the IR. We did this with custom-built holders built from hardened steel at OSU. We flex-tested it he
Update 09.20.2018 -- Run 9 pp: Default vs. Efficiency +- 5% With No Errors on Efficiency (R = 0.2 Charged Jets)
Yesterday I checked what happens when I fix the response matrix, but change the efficiency:
HF-PWG minutes 2018/09/20
Updated on Thu, 2018-09-20 10:27. Originally created by marr on 2018-09-20 10:27.1) Electron PID using a likelihood classifier - Matthew Kelsey
STAR endcap TOF/CBM TOF meeting
Updated on Thu, 2018-09-20 06:48. Originally created by fseck on 2018-09-20 06:48. 2018-10-04 10:00
2018-10-04 12:00
America/New York
Thursday, 4 October 2018
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 14:00 (GMT), duration : 02:00
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 14:00 (GMT), duration : 02:00
STAR endcap TOF/CBM TOF meeting
Updated on Thu, 2018-09-20 06:48. Originally created by fseck on 2018-09-20 06:48. 2018-09-20 10:00
2018-09-20 12:00
America/New York
Thursday, 20 September 2018
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 14:00 (GMT), duration : 02:00
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 14:00 (GMT), duration : 02:00
Electron PID using a Likelihood method
Updated on Thu, 2018-09-20 00:18. Originally created by mkelsey on 2018-09-20 00:18.JetCorr Follow-Up [09.11.2018] -- Closure Tests With Bayesian And SVD Unfolding
Something seems to be going on with the SVD algorithm in our correction scheme:
EPD around Sept 2017
Updated on Wed, 2018-09-19 17:14. Originally created by lisa on 2018-09-19 16:45. In mid-September, 2018, a look back at just....
.... one year ago...
.... one year ago...
a new unfolding including temrapature fluctuation
Updated on Mon, 2018-10-15 23:20. Originally created by sesumi on 2018-09-19 13:11.Update 09.18.2018 -- Run 9 pp: Default Unfolding vs. Efficiency +- 5% With Fixed Response Matrix (R = 0.2 Charged Jets)
Following up from earlier today:
https://drupal.star.bnl.gov/STAR/blog/dmawxc/update-09182018-run-9-pp-default-unfolding-vs-efficiency-5-r-02-charged-jets
Update 09.18.2018 -- Run 9 pp: Default Unfolding vs. Efficiency +- 5% (R = 0.2 Charged Jets)
Following up from yesterday:
number of hits in sectors depending on voltage
Updated on Tue, 2018-09-18 10:56. Originally created by mstefaniak on 2018-09-18 10:56.number of hits in sectors depending on voltage
Updated on Tue, 2018-09-18 10:56. Originally created by mstefaniak on 2018-09-18 10:56.FCS sampling fraction
Updated on Mon, 2018-09-17 17:17. Originally created by hl60 on 2018-09-17 17:01.Speaker : Huanzhao Liu, Ting Lin
Talk time : 10:20, Duration : 00:20
Update 09.17.2018 -- Run 9 pp: Default Unfolding vs. Efficiency +- 5% (R = 0.2 Charged Jets)
Earlier today, I presented the systematic uncertainties for the unfolded pi0- and gamma-triggered R = 0.2 charged jet distributions.