Software and Computing Meeting

2018-10-17 12:00
2018-10-17 13:00
America/New York
Wednesday, 17 October 2018
1-189, SRN, at 16:00 (GMT), duration : 01:00
TimeTalkPresenter
12:00Study of TPC calibration uncertainty considerations in efficiency corrections ( 00:20 ) 1 fileYuanjing Ji (USTC)
12:20eTOF status update ( 00:20 ) 1 fileFlorian Seck (Darmstadt)
12:40Follow-up on JetCorr issue (simulation) ( 00:15 ) 0 filesGene Van Buren (BNL)
12:55AOB ( 00:05 ) 0 filesAll (All)

Azimuthally sensitive HBT in UrQMD

Centrality determination AuAu 54GeV

 

Radiation Damage

Simulation

Speaker : Guannan Xie, Te-Chuan Huang


Talk time : 10:10, Duration : 00:20

 https://drupal.star.bnl.gov/STAR/system/files/20181015_FTS_GXie.pdf

BEMC Calibration 2015 - October 16 Update

At last week's meeting it was mentioned that the current method of determining the E/p mean may not be the best way since it is dominated by the low momentum tracks.

Mechanical Structure

Speaker : Yi Yang


Talk time : 09:50, Duration : 00:10

 

News

Speaker : All


Talk time : 09:30, Duration : 00:10

 

STAR Forward Silicon Tracker Meeting

2018-10-18 09:30
2018-10-18 10:30
America/New York
Thursday, 18 October 2018
, at 13:30 (GMT), duration : 01:00
TimeTalkPresenter
09:30News ( 00:10 ) 1 fileAll
09:40Sensor ( 00:10 ) 0 filesLi Yi, Yi Yang, Zhenyu Ye
09:50Mechanical Structure ( 00:10 ) 0 filesYi Yang
10:00Flexible Cable ( 00:10 ) 0 filesLi Yi, Zhenyu Ye
10:10Simulation ( 00:20 ) 1 fileGuannan Xie, Te-Chuan Huang
10:30Radiation Damage ( 00:20 ) 0 filesGuannan Xie

fSTAR NSF MRI Preparation

This page summarizes all the information needed for STAR Forward Upgrade NSF MRI Proposal

Submission Deadline: 

Using the EPD event-plane finder

How to find the Event Plane with the STAR EPD code StEpdEpFinder

Contents:

gaintest


Talk time : 10:00, Duration : 00:20

 

Update 10.15.2018 -- Run 9 embedding: tracking efficiency vs. upper pTtrk cut

Just as a quick check, the plots below compare the tracking efficiency for different cuts on track 'pT'.  Aside from the different 'pT' cuts, the track QA cuts are fixed.

iTPC Software Meeting

2018-10-16 10:00
2018-10-16 11:00
America/New York
Tuesday, 16 October 2018
BNL: 1-224; BLUEJEANS: 481 429 146, at 14:00 (GMT), duration : 01:00
 
TimeTalkPresenter
10:00gaintest ( 00:20 ) 1 file

STAR endcap TOF/CBM TOF meeting

2018-11-01 10:00
2018-11-01 12:00
America/New York
Thursday, 1 November 2018
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 14:00 (GMT), duration : 02:00

STAR endcap TOF/CBM TOF meeting

2018-10-18 10:00
2018-10-18 12:00
America/New York
Thursday, 18 October 2018
The meeting is scheduled on Bluejeans: https://bluejeans.com/303776107, at 14:00 (GMT), duration : 02:00

HF minutes - 2018/10/4

1) psi(2S)->J/psi+pipi in 500 GeV p+p - Chan-Jui Feng

HF minutes - 2018/9/6

 1) Update on Run14+16 Upsilon->mumu - Pengfei Wang

Forward upgrade -- FCS pythia jet

 

Review of STAR Forward Upgrade November 2018

This page summarizes all the information for the Review of the STAR Forward Upgrade