Conference talk |
Coffee break |
jeromel |
|
Conference talk |
Calibration status overview for Run 11, R&D and path toward Run 12 |
jeromel |
|
Conference talk |
Tracking review results summary and committee findings |
jeromel |
|
Meeting talk |
follow-up on position vs angle at RP's plots |
pile |
|
Meeting talk |
cosmictracks |
ckriley |
|
Meeting |
FGT Software Meeting |
avossen |
|
Meeting talk |
Embedding status - opened problems and ongoing work |
jeromel |
|
Meeting talk |
REview of the status of the dE/dx and possible resolution improvements |
jeromel |
|
Meeting talk |
Calibration status for Run 11, AuAu 200 GeV |
jeromel |
|
Meeting |
Software and Computing Meeting |
jeromel |
Software and Computing, STAR Protected |
Meeting talk |
follow-up on angle-position study at RP4 for Blue Beam |
pile |
|
Meeting |
Software and Computing Meeting |
jeromel |
Software and Computing, STAR Protected |
Blog entry |
WSC in clean room |
videbaks |
|
Meeting talk |
Tester slots, results and questions |
jeromel |
|
Meeting talk |
Logistic forward and timing |
jeromel |
Software and Computing, STAR Protected |
Meeting talk |
Review of the production samples readiness |
jeromel |
|
Meeting talk |
Review of past action items |
jeromel |
Software and Computing, STAR Protected |
Meeting talk |
Updates on the committee members + fixing review date |
jeromel |
|
Meeting |
2011 BNL local group presentations #12: Recent Results from ALICE and COMPASS |
jeromel |
|
Meeting |
Anode voltage, status report |
jeromel |
|
Meeting talk |
Crossing angle from y vs x |
wlodek |
Peripheral Collisions, STAR Protected |
STAR Simulations Request |
dbar in run 10 Au+Au 200 GeV |
tone421 |
|
STAR Simulations Request |
high-pT J/Psi in p+p 200GeV Run9 |
bielcik |
|
STAR Presentation: Meeting |
14th Workshop on Elastic and Diffractive Scattering |
jhthomas |
|
Conference talk |
Reception |
tone421 |
|