Sort by:[Date]

Run12 pp500 Pre- and Post-shower Gains Over Time

Pion Gun

 

3He production at BES energies

FMS Run 15 QA (p+p 200 GeV)

Basic QA
transverse polarization: runs 16066033-16093018
longitudinal polarization: runs 16093061-16100070

FMS triggers

EPD materials

Really just a list, with links, to materials used in the EPD.  The construction proposal is attached below, as well.

Plate 1 Layout

On Monday July 18, 2016.

Today the PSU shop ran the computer controlled tool with a file for hole positions that we provided.
They  driledl and tapped 112 holes

STAR council meeting at OSU meeting

 

Lepton analysis tree request for PWG disk lease

 

ICNFP talk

Hard Probe 2016