Sort by:[Date]

dE/dx calibration 2016 AuAu200 & dAu200.

 The test jobs in dev with dE/dx calibration from MySQL (10/15/2016) have been completed. 

W Endcap P1 using STI

 

Run15 FMS QA (1)

- Slide written in last week (Oct. 14)
- Small progress made in this week: variables vs. Run 2D plotting code is done

FPost assembly (3)

HF-PWG minutes 2016/10/20

 1) Upsilon in p+p 500 GeV - Leszek Kosarzeski

Nuclear Science Division Directors Review in Oct. 26-28, 2016.

 

Track pT Cut Update

 

dN/dx, S&C meeting

 1. dN/dx method has been described during the presentation on PWGC meeting, September 30, 2016, https://drupal.star.bnl.gov/STAR/system/files/dNdx_rev3.pptx.pdf

Kaon TOF match efficiency

 

Mike's test blog page

I am trying to see what works in this editor

For example, this text should be red.

And a horizontal line is supposed to go right below this sentence.


And below here is a so-called "teaser break":