Sort by:[Date]

Analysis report 161206

Analysis report of NPE in Au+Au Run14 at sqrt{s_NN} = 200 GeV.

FPOST: patch panel and QT board mapping

 

BBC ADC Sum Comparison after BBC Simulator Code Modified by Akio

Preliminary Results for Jpsi Difference Cross-Section from Run12 p+p 200 GeV and Run11+13 p+p 500 GeV

 

Visual Representation of cable map for QT Boards connected to FPOST Shower

Easy way to understand and visualize the way the signal cables from the FPOST connect to the QT boards.

Visual Representation of TUFF Box Map for FPOST Shower

Easy way to understand and visualize the way the multidrop cables that connect the FPOST to the TUFF Box are mapped.

Compare Data to Hijing

Fms meeting- uodate on mass shift

 

Vertex Reconstruction: muDst status