- My blog
- Post new blog entry
- Top bloggers
- Recent posts
Sort by:[Date]
Projection of the di-jet asymmetries at forward upgrade
Updated on Fri, 2019-06-14 11:38. Originally created by veprbl on 2017-07-05 11:10.Errata:
- In jet_meeting_2017_07_05.pdf was comparing to pp200 lumi, but pp510 lumi is order of magnitude higher. Fixed in v2.
STAR Management Matters
Updated on Fri, 2018-10-12 12:31. Originally created by caines on 2017-07-05 09:34.SQM talk draft
Updated on Sat, 2017-07-08 12:05. Originally created by videbaks on 2017-07-04 14:24. Attached are the version of the STAR invited talk for the Friday plenary session on upgrades.
Version v4 updated after the practice talk on Friday.
Toy MC for EPD dN/deta
Updated on Tue, 2017-07-18 13:54. Originally created by hanseul on 2017-07-03 13:58.In the current EPD software framework, pseudorapidity (=eta) is determined based on the primary vertex position and the particle position at EPD.
sector leakage test for 0009
Updated on Mon, 2017-07-03 01:44. Originally created by qhxu on 2017-07-03 01:44.a short video for leakage test after installing the itpc sector in the testing chamber. Pure Argon was flowed in with +1~2mbar and then check with GasCheck. This video is for #0009.
unpacking iTPC pre-production
Updated on Sat, 2017-07-01 14:34. Originally created by videbaks on 2017-07-01 14:15.Here are some of the pictures when we unpacked the first sector from SDU