Sort by:[Date]

TPC tests using Vernier Scan

These are some TPC tests that need to be taken before Run 18 isobar operations end.

iTPC GridLeak wall voltage tests

Updated Midrapidity Collins Statistical Projections

Updated Collins asymmetries using final 2011 published data.

HFT effect on primary tracks in BHT2 lowmid AuAu14

 

HF minutes 2018/05/01

Lukas Kramarik:
Add TMWA technical plots instead of v2 results.

Sooraj Radhakrishnan:
slide 8 – extract and propagate correct errors on the ratio.

The STAR Mid-Rapidity Physics Program after the BES-II

 Upgrades that are currently underway to maximize the physics output from Beam

The STAR BES-II and Forward Rapidity Physics and Upgrades

 The second phase of the Beam Energy Scan at RHIC, BES-II, is scheduled for 2019-2020 and will explore with precision measurements

D0 v1 Preliminary Figures

 

Adding covariance matrix for KF Particle Finder

 

qm18 star bulk/corr talks and posters, proceedings

General Info

 This page has different info scattered over different topics