Sort by:[Date]

AuAu@27GeV full production QA

Attached is the QA plots for the AuAu@27GeV full production. The red lines on the run by run QA plots are Ave+/-5 \sigma.

Bulkcorr_0710_isobar_QA

 

Run18 isobar 200GeV data QA, correlator reproduction

 

Run15 pp200 Transverse -- Jet Meeting 2019-07-10

 2015 pp200 Transverse embedding estimation 

sTGC manual (run19 200GeV)

v1 uploaded 07/09

v2 uploaded 07/10, changed voltages to 1450 Full HV and 450 for standby.

TOF_MTD_ETOF_Shutdown_status

 

SL19c FMS QA

Pre-production FMS QA with SL19c

RUN15pp200trans intermediate calibration results

- 8 of 9 subgroups were calibrated at least once by a full calibration
- Cell by Cell mass distribution can be provided if there's request

isobar QA

 

Forward upgrade -- Clustering

FCS Hadron contamination 2019-07-30: presentation