Sort by:[Date]

TOF_oncall_Expert_Base

 

  • Expert Knowledge Manual
    •  
    •  
    •  

Femtoscopy in d+Au 200 GeV

eTOF start time study for runs with bad reset time

sTGC Pentagon Prototype Shape

 The diagonal pad will be 3mm smaller compared to strip pad. In this version, they are still the same size.

STAR shift 01/08/2020

Measuring the nuclear deformation in U+U collations

Update on TMVA Regression with weight:0

 

 

Weighing 

Comparison fast off-line (dev, 12/28/2019) and TFG19m (new alignment and calibration)

 The express TPC alignment and dE/dx calibration based on Cosmic and 11p5GeV collision data for Run XX has been finished 2019-12-24 and frozen as release TFG19m.

Poster abstract for Hard probes 2020

 

Hard Probes 2020