Sort by:[Date]

210114_3GeVXipolarization

Azimuthal_Fluctuations_2-4-21

 

EPD West PP5 TT23

 West PP5 TT23 which corresponds to EQ1 board 6 channel 7.  This tile was out during run 21.  Prashanth found that the wire going into the QT board had gotten loose from the connector.

docs for run

unflat dN/dphi in EPD at 27 GeV (Run18)

 Attached is the presentation to FCV on Feb03 2021

CPODAbstract

 

Estimates for D* in p+p 200 and 500 GeV / e-/e+ ratio studies in Run12

Yield estimates for D* in 200 and 500 GeV datasets based of FONLL
Update on studies of e-/e+ ratio in run 12

Estimates for D* in p+p 200 and 500 GeV / e-/e+ ratio studies in Run12

Machiine Learning with HIJING data

 

R-corr AMPT comparison