Sort by:[Date]

iTPC -- TPC QA run22

Run 22 ended on April 18.

At the end there was 205 masked out FEEs in the iTPC. this is about 18%
See attached plots.

QM 2022 Abstract

 

QM 2022 Abstract

 

QM 2022 Abstract

 

update Lambda polarization at Isobar data

 

Abstract QM22

 

TPC SC & GL Calibration: How To?

  This is a brief documentation for the TPC Space-Charge (SC) and Grid-Leak (GL) calibration. 

2021-11-03 Polarization 19.6 GeV

 

FCS(ECAL) MIP peak for OO_200 and dAu_200 Run21

 Looking at the ECAL MIP peak and planning to project the MIP track from ECAL to HCAL.