Sort by:[Date]

STAR Coll. meeting 2022 Feb.

 https://drupal.star.bnl.gov/STAR/system/files/Collaboraiton_CZhang_Feb16_0.pdf

Run22 EPD 'Live' Calibration day 51-57

 Here are my results of calibrating the EPD over days 51-57 of run22. Fairly behaved week; day 54 had low statistics but otherwise followed the pattern of other days.

Run 22 Cold QCD Offline QA - Days [054 - 060]

 

Jpsi production in isobar

 

Jpsi production in isobar

 

Jpsi production in isobar

 

HoSanKO_QM2022_v2_1.pdf

 HoSanKO_QM2022_v2_1.pdf

ZDC SMD gain factor vs. time

1.

Isobar 80-100

 

Correlations in UPC?