- My blog
- Post new blog entry
- Top bloggers
- Recent posts
Sort by:[Date]
Fast offline QA Au+Au@200GeV (run2023)
Updated on Fri, 2023-07-14 10:00. Originally created by yuno on 2023-05-22 12:54.Regular QA
Trigger: 900001 and 900001+40+41
Vz cut: -145., 145.
XYSqr cut: 2.
NHits cut: 10, 1e6
P cut: 0., 100.
Pt cut: 0.15, 1.45
QA for BHT3 dataset
Updated on Tue, 2023-05-23 13:55. Originally created by bschaefer on 2023-05-20 11:48.
Have the EPD SiPMs degraded over time?
Updated on Fri, 2023-05-19 14:30. Originally created by lisa on 2023-05-19 10:01.Executive Summary
Silicon multipliers (SiPMs) are damaged by radiation. This increases dark current and noise, broadening a peaked distribution of (e.g.) measured energy loss in a deteE0_p in pT from 1 to 1.0
Updated on Thu, 2023-05-18 21:28. Originally created by kshen on 2023-05-18 21:28.
Semi-successful EPD timing scan for 2023 RHIC run
Updated on Thu, 2023-05-18 17:19. Originally created by lisa on 2023-05-18 16:26. This page describes the EPD timing scan for the 2023 RHIC run, done in very early hours 18 May 2023. It is deemed "semi-successful" because the new fourth crate (EQ4) in the syste
Femtoscopy of D0-hadron with Au+Au, run 2016 at 200 GeV [IS & QM 2023]
Updated on Thu, 2023-05-18 08:28. Originally created by priyankawut on 2023-05-18 08:28.
cut optimiziaion
Updated on Thu, 2023-05-18 01:03. Originally created by wy157543 on 2023-05-18 01:03.
Hard Probes May 18 2023 D0 Jets AuAu 200 GeV
Updated on Thu, 2023-05-18 08:58. Originally created by droy1 on 2023-05-17 23:57.Run 23 EPD Commisioning
Updated on Wed, 2023-05-17 12:17. Originally created by protzt on 2023-05-17 12:17.Commissioning the EPD for run 23 was the job that never ended. In this post, I will attempt to summarize the actions taken from the end of run 22 through the commissioning with beam of the EPD i